
ADD BATH remodeling & design
Basement bathroom addition & plumbing rough-in
We build a basement bathroom from the slab up: walls, drain lines, shower, toilet and vanity. A pump, if you need one, is priced after the visit.
Free on-site consultation. We usually reply within an hour, Mon to Sat, 9 am to 8 pm.
OfferFree Shower Upgrade Package
- WA registered contractor
- Bonded & insured
- L&I ADDBABL764KO
- 2-year workmanship warranty (opens in a new tab)
5.0★★★★★(84 reviews)
5.0★★★★★(18 reviews)
- Kate S.May 2024 on Google★★★★★
Basement bathroom and rental conversion
Turned my cold grey unusable basement into a great rental unit for a bargain of a price. He helped plan out the layout... and made sure that it was all up to code and fully legal.
- Terea B.July 2025 on Google★★★★★
Subfloor and joist repair under a bathroom
We discovered a soft spot on our bathroom floor... After the initial tear out, the damage was much more severe than expected. Dmitrii gave a second quote and took care of the problem... He is very professional, and he explained all as he went along.
- MaxMay 2024 on Google★★★★★
New bathroom with a larger shower
You used excellent materials to build my new bathroom... And they did it in ten days... You were able to make my shower larger and being as I'm a big guy I love it. They didn't make a mess during demo.
What a basement bathroom addition includes
We build the new bathroom from the framing to the final walkthrough, with the plumbing, electrical and permits in one written scope. It usually covers:
- Custom quoteFree site reviewdrain depth, slab routing or pump needs evaluated in person before quoting
- Design to finishAbout 1 to 6 monthsdesign and permit review take much of that time
- Slab workAbout 40 sq ftof slab cut and patched for the new lines
- Priced after the site visitPump, drain run, moisture workan ejector or upflush pump if the main drain leaves the house above the basement floor
- Protection of floors and the path through your home, dust barriers and daily cleanup
- Framing for the new walls and blocking for fixtures and future grab bars
- New drain, vent and supply lines for the shower, toilet and sink, by licensed plumbers
- A new 20-amp circuit, outlets, switches and two recessed lights
- An exhaust fan ducted outdoors
- Drywall on the walls and ceiling; backer board and waterproofing in the shower
- Acrylic shower base and wall panels with a glass door (tile is an option)
- Vinyl plank floor, vanity, mirror and light, toilet and accessories
- A new door, baseboards, paint and a final walkthrough
Priced after the site visit: an ejector or upflush pump if the main drain leaves the house above the basement floor, a longer drain run and moisture work on the walls.
Thinking about a basement bathroom?
Leave your name and number. We'll call to talk through your basement bathroom and set up a free on-site consultation.
Who does the work, and what to expect
Our remodeling team
Our bathroom remodeling team carries out the construction work. Licensed plumbers and electricians handle their trades.
Checked at the first visit
We check the main drain, damp walls and headroom at the first visit, then put the result in your written scope and price.
Permits and inspections
A new bathroom needs building, plumbing and electrical permits. We draw the layout and permit drawings, apply and book the inspections.
Add a bathroom in a basement
Whether a basement can take a bathroom comes down to three things: where the main drain runs, how damp the walls and floor are, and how much room you have under the beams and ducts. We check all three at the first visit and put the result in the written scope and price.
Where the main drain runs
This one decides the plumbing. If the main drain runs below the basement floor, the new lines slope to it through the slab (see plumbing rough-in and slab work). If it leaves the house above the floor, the bathroom needs a pump (see ejector pump and upflush bathrooms).
Damp walls and floors
Basements here stay damp for much of the year, so we check the walls and the floor before we plan a finished room, and the exhaust fan is ducted outside. Moisture work on the walls is priced after the site visit.
Headroom and layout
We measure the ceiling under the beams and ducts, find a spot where the shower can stand and the door can swing, and sketch the layout so you see what fits before you decide.
Plumbing rough-in and slab work
Rough-in is the plumbing that disappears behind the walls and under the floor: the drain, vent and supply lines that go in before the walls are closed and the floor is patched. Our licensed plumbers lay out the lines for the shower, toilet and sink, and the drain has to slope to the main line the whole way.
Cutting and patching the slab
When the drain runs below the floor, the new lines go in a trench in the concrete. We mark the route, protect the floors and the path through your home, put up dust barriers and cut the slab along the line. The trench is dug out, the drain and vent lines are laid to slope, the work is inspected where the permit calls for it, and we patch the slab with concrete before the new floor goes down. We measure the exact trench run needed from your new fixtures to the main drain before quoting. A longer run to the main line costs more, and we price it after the site visit.
Supply and vent lines
Cold water runs to the toilet, and hot and cold water to the vanity and the shower. Every fixture is vented, and the exhaust fan duct goes outside. All of it is in place before the walls are closed up.
Ejector pump and upflush bathrooms
If the main drain leaves the house above the basement floor, the waste has to be lifted to it. There are two ways to do that, and we pick between them with you at the first visit, once we know the drain depth and the fixtures you want.
Ejector pump
A sealed basin is set into the slab. The shower, toilet and sink drain into it, and a pump lifts the waste to the sewer line. The basin has a tight lid and its own vent. It means cutting more of the slab, and it suits a full bathroom with a shower, a toilet and a sink.
Upflush toilet system
A compact unit sits on top of the floor behind the toilet. It grinds the waste and pumps it up through a small pipe to the drain line, so the toilet does not need a basin or a trench in the slab. Some units also take a sink or a shower; we check that against the fixtures you want.
Both need power and a way to reach the pump for service, so we plan where it sits before the walls go up. Whether you need a pump or slab tie-in is checked at the site visit and included clearly in your written quote.
From the slab to the last fixture
An example of a basement bathroom with the concrete slab and drain exposed. A pump, where a home needs one, is not shown.

Slab and drain
We cut the slab where the new drain runs, then patch the concrete before the vinyl plank floor goes down.
Shower head and valve
The supply lines go in before the walls close, and we connect the shower valve and head you pick.
Shower walls
Backer board and waterproofing go on the shower walls first, then we set the wall panels, or tile if you choose it.
Glass door
After the shower walls are finished, we install the glass door and adjust it until it closes smoothly.
Vinyl plank floor
We lay vinyl plank over the patched slab after the walls are painted, then set the vanity on top of the finished floor.
Toilet
We set the toilet you pick on the finished floor and connect it to the new drain and the water supply.
Small bathrooms we've built
Photos from ADD BATH projects.
What a basement bathroom addition costs
How it is quoted
Free written quoteafter a site review
For a shower bath in a basement where the drain can reach the main line: two new walls, about 40 sq ft of slab cut and patched for the new lines, an acrylic shower with a glass door, a fan ducted outside, a new circuit, two recessed lights, drywall, vinyl plank floor, vanity, toilet, door and paint. Labor and rough materials at our Essential package level (the finish materials you pick are extra). Drawings, asbestos testing and permits are priced separately. Tile instead of acrylic, a larger room or the items above move the number up.
Pay over time with Wisetack. 0% APR options for up to 12 months.* *Subject to credit approval. See terms
Timeline
How long it takes
Plan on about 1 to 6 months from design to finish for an addition or converted space; design and permit review take much of that time. You get your own schedule with the written scope.
Design your bathroom in 3D.
Pick your room size, layout, style and fixtures in our 3D builder, then request a custom written quote.
Start from one of our designs
Six bathroom design options with suggested tile, vanities and fixtures.
Clear Line
Modern minimal. Large-format porcelain, a floating vanity, frameless glass and a curbless shower.
Bungalow Classic
Classic for older homes. Marble-look tile, a hex mosaic floor, a vanity on legs and polished nickel.
Cedar & Stone
Organic. Walnut vanity, limestone-look tile, plaster-look walls and matte brass.
Hot Springs
Spa. A walk-in shower with a bench, a handheld shower, a heated floor and warm stone-look tile.
Cost, pumps, permits and timing: questions homeowners ask
How much does a basement bathroom addition cost in Everett?
Basement bathroom addition costs depend primarily on how far the new drains are from your main sewer line, whether slab cutting or an ejector/upflush pump is required, permits, and your finish selections. We inspect your basement at a free site visit and prepare a detailed written scope and quote. See how pricing works.
Do I need a pump?
If the main drain leaves the house above the basement floor, yes: an ejector or upflush system lifts the waste to the drain. If the drain runs below the floor, we tie in by cutting the slab. We check which one you have at the first visit.
What is the difference between an ejector pump and an upflush toilet?
Both lift the waste when the main drain leaves the house above the basement floor. An ejector pump sits in a sealed basin set into the slab and serves a full bathroom with a shower, a toilet and a sink. An upflush unit sits on the floor behind the toilet, grinds the waste and pumps it up through a small pipe, so the toilet needs no basin or trench in the slab. We choose between them with you at the first visit, once we know the drain depth and the fixtures you want. Whether you need a pump or slab tie-in is checked at the site visit and included clearly in your written quote.
Do I need a permit?
Yes. A new bathroom needs building, plumbing and electrical permits; some cities also require plan review. We prepare the drawings, apply and book the inspections; drawings and permits are priced separately.
How long does it take?
Plan on about 1 to 6 months from design to finish for an addition or converted space; design and permit review take much of that time. You get your own schedule with the written scope.
Does a new bathroom need a window?
It needs ventilation. A fan ducted outdoors is part of the price; a window is an option where the wall allows it.
Is the work covered by a warranty?
Yes. Every bathroom has a written 2-year warranty from the final walkthrough. It covers our labor, the waterproofing and the tile we install. Caulk joints are covered for the first year only. Manufacturer defects in fixtures and materials fall under the manufacturer's warranty, and we help you file the claim. See what the warranty covers (opens in a new tab).
Rather talk it through?
Call us Mon–Sat, 9 am–8 pm, or request a free on-site consultation.
Pick a day for your free on-site consultation
Choose a time window and we'll call to confirm.
What's included
- Measurements and a look at your bathroom, at your home
- 3D design of your new layout
- Material selections that work together
- A written scope and quote
- Financing options through Wisetack
- 2-year workmanship warranty
Prefer to talk? Call (425) 550-9475
Basement bathroom addition in Everett and Snohomish County
A basement bathroom is a common start for a rental unit or a guest suite. If that is the plan, we talk through what your city needs for it at the first visit.
A new bathroom needs building, plumbing and electrical permits. Inside Everett city limits that is the City of Everett; in unincorporated Snohomish County it is Planning and Development Services; Lynnwood, Bothell and the other cities each have their own counter, and some require plan review. We draw the layout and permit drawings, apply and book the inspections; drawings, asbestos testing and permits are priced separately. Before we open walls, a certified inspector checks for asbestos, as the Puget Sound Clean Air Agency requires for contractor work in the region.
ADD BATH is based on SE Everett Mall Way. We are a WA-registered contractor (L&I ADDBABL764KO), bonded and insured. We work across Snohomish County, from Everett, Mukilteo and Mill Creek to Lake Stevens and Marysville, and in North Seattle and on the Eastside (service area).








