Small bathroom with a white vanity, a black mirror, a toilet and dark floor tile

ADD BATH remodeling & design

Small bathroom, guest bath & powder room remodeling

Remodel a 5x8 full bath, guest bath or powder room while keeping the existing plumbing locations.

Get a free estimate

Free on-site consultation. We usually reply within an hour, Mon to Sat, 9 am to 8 pm.

or build your bathroom in 3DCall (425) 550-9475

5.0 on Google, 84 reviewsand 5.0 on Yelp, 18 reviews

OfferFree Shower Upgrade Package Through Dec 31, 2026 · Valid with financing. Offer details (opens in a new tab)

  • Google5.0(84 reviews)
  • Yelp5.0(18 reviews)
  • Shannon W.December 2025 on Google

    Toilet replacement

    I had an old toilet with a slow leak. Dmitri replaced my toilet during the holidays and stayed late to make sure everything was sealed and working properly.

  • Quinn C.August 2025 on Google

    Drywall and tile repair

    Great experience with a drywall and tile fix. Dmitrii went above and beyond to get the job done. I am grateful for his patience and attention to detail.

  • Dovie R.March 2025 on Google

    Bathroom remodel

    I am thrilled with my bathroom remodel! The team was incredibly professional, and the end result is simply stunning!

  • Louis M.March 2025 on Google

    Modern bathroom remodel

    Exceeded all my hopes for a modern bathroom! The design and execution were handled with such professionalism and thoughtfulness that I never felt overwhelmed by the renovation process.

  • Kate S.May 2024 on Google

    Basement bathroom and rental conversion

    Turned my cold grey unusable basement into a great rental unit for a bargain of a price. He helped plan out the layout... and made sure that it was all up to code and fully legal.

  1. Powder room3 to 8 daysvanity, toilet, mirror, lighting, flooring and paint with a free written quote
  2. Powder room on site3 to 8 working daysa full 5x8 bathroom in the same layout takes about 2 to 4 weeks
  3. Full 5x8 bathroom2 to 4 weekstub or walk-in shower, floor tile, vanity, toilet, fan and paint — quoted in writing
  4. Moves the priceTile floor, wall-hung vanity or a new fanthese options move the number up

Planning a small bathroom or powder room remodel?

Tell us about your room, and we'll call to set up a free on-site consultation.

Small bathroom remodel: 5x7, 5x8 and 5x10

A small bathroom is not a small project: every inch has a job. We keep the plumbing where it is whenever we can and spend the budget on what you use every day.

The standard 5x8

Most 5x8 bathrooms work best with the tub or shower across the 5 ft end wall and the toilet and vanity side by side on one 8 ft wall, so the plumbing stays where it is. Leaving the fixtures where they are is one of the simplest ways to control cost.

What a 5x8 costs

A standard 5x8 full remodel updates everything around your existing plumbing: a new tub with a tile surround (or walk-in shower) and glass door, porcelain floor tile, recessed niche, vanity, toilet, mirror and light, humidity-sensing fan, trim and paint — all detailed in one written scope.

Shower or tub in a small bathroom

Many small bathrooms give you a choice: keep the tub, or convert the alcove into a walk-in shower. Whether you choose a complete remodel down to the studs or a focused tub-to-shower conversion in the same alcove, we compare both options in 3D during your free consultation. For the shower on its own, see shower remodeling.

Other sizes: 5x7 and 5x10

A 5x7 bathroom has 5 square feet less than a 5x8, and a 5x10 has 10 square feet more. The list of work is the same kind as for a 5x8. The floor and wall area is what changes, and it sets how much tile and labor the room takes. We price both from your written scope after we measure.

Fit and clearances

In Washington the center of the toilet has to be at least 15 inches from a side wall, the tub or the vanity, with 21 inches of clear space in front of it in a home. On the 8 ft wall a 30-inch vanity fits beside the toilet either way; a 36-inch vanity needs a shallower tub or shower. We measure from finished surfaces. See the 5x8 bathroom guide.

Small-room ideas that work

Vanity, mirror and light

A shallow or wall-hung vanity can leave more floor space. We also plan mirror size and lighting around the room dimensions.

A door that gives room back

If the door swings into the toilet, a pocket door can help. In the shower, clear glass instead of a curtain lets the eye run through to the far wall.

A niche instead of shelves

A tiled niche keeps shampoo off the tub edge and the floor clear, and it adds no depth to the room.

What a powder room or half bath remodel includes

Planning a full 5x8 bathroom? See full bathroom remodeling. We update the room around the plumbing you already have. Your written scope lists every line; it usually covers:

  • Protection of floors and the path through your home, dust barriers and daily cleanup
  • Old vanity and toilet removed
  • Sink drain and supply adjusted for the new vanity
  • New vanity with top, sink and faucet
  • New toilet
  • Mirror and vanity light
  • Luxury vinyl plank floor and baseboards
  • Towel bar, hook and paper holder
  • Walls and ceiling painted
  • Caulk, cleanup and a final walkthrough

Options: tile instead of vinyl, a wall-hung vanity, a pocket door or a new fan. Adding a half bath where there isn't one is a half bath addition. Only the vanity or the toilet needs replacing? That can be a small project. See bathroom vanity installation and bathroom faucet, toilet and mirror replacement.

Who does the work, and what to expect

Our remodeling team

Our bathroom remodeling team carries out the construction work. Licensed plumbers and electricians handle their trades.

Damage behind the walls

If we find rot or damage behind the tile, we stop, photograph it and show you. Your contract lists unit prices for common repairs.

Permits and inspections

Moving plumbing, and in several cities a new tub or shower, needs a permit. We apply and book the inspection.

A powder room, piece by piece

A powder room shown in section, with the vanity, toilet, flooring, mirror and light visible.

Conceptual 3D powder room cutaway with a white Shaker vanity, a sink P-trap visible inside the cabinet, an oval mirror, a toilet and checkerboard floor tile
Conceptual cutaway. Layer thicknesses are exaggerated for clarity.
  1. Floor

    We lay the floor you choose, vinyl plank or tile, and put in the baseboards.

  2. Vanity

    We take out the old vanity, haul it away and set the one you pick level and fastened to the wall.

  3. Toilet

    We set the toilet you pick, or reset your own, on a new wax ring, connect the water and make sure it doesn't rock.

  4. Sink and faucet

    We connect the sink and faucet you pick to the drain and water lines, then run the water and check the connections.

  5. Mirror and light

    We hang the mirror you pick, then mount and connect the lighting you pick.

Vanities and small bathrooms we've built

Photos from ADD BATH projects.

Small bathroom with a white vanity, a black mirror, a toilet and dark floor tile
Half bath, dark floor
Small white vanity with a black faucet, a round mirror and a toilet
Compact vanity and toilet
White shaker-style double vanity with a quartz top and two undermount sinks
White shaker double vanity

See more of our projects

What a small bathroom remodel costs

How it is quoted

Free written quoteafter an on-site visit

For a typical half bath: a new vanity with top and faucet, a toilet, mirror and light, vinyl plank floor, accessories and paint. Labor and rough materials at our Essential package level (the finish materials you pick are extra). Tile flooring, a wall-hung vanity or a new fan move the number up. If the work needs a permit or asbestos testing, they are priced separately.

  • Powder room: vanity with top and faucet, toilet, mirror and light, floor, accessories and paintFree on-site quote
  • Full remodel, standard 5x8 bathroom: new tub with tile surround and glass door, floor tile, vanity, toilet, fan, paintFree on-site quote

Pay over time with Wisetack. 0% APR options for up to 12 months.* *Subject to credit approval. See terms

Timeline

How long it takes

A powder room usually takes 3 to 8 working days on site, and a full 5x8 bathroom in the same layout about 2 to 4 weeks. Permits, inspections and material delivery can add time; you get your own schedule with the written scope. See typical timelines

What each package includes

Every powder room includes demo and haul-away, framing touch-ups, new floor tile, a new fan on a humidity switch, GFCI outlets, baseboards, paint, towel bar and hooks, project management and final cleanup. The package sets what goes in the room and the grade of rough materials (waterproofing, fan, switches, paint), which goes up with each package. Each package below shows a sample 4x6 powder room build level and is tailored to your room at your free on-site consultation.

Essential

Clean & durableFree written quote

  • Vanity with top and faucet
  • Mirror and light
  • New toilet

Finish materials selected with you at consultation

Comfort

Upgraded rough-inFree written quote

  • Vanity with top and faucet
  • Mirror and light
  • New toilet

Finish materials selected with you at consultation

Premium

Modern & customFree written quote

  • Floating vanity
  • Lighted LED mirror
  • Recessed lights

Finish materials selected with you at consultation

In a powder room, Essential and Comfort put in the same items; Comfort uses a higher grade of rough materials.

Design your bathroom in 3D.

Pick your room size, layout, style and fixtures in our 3D builder, then request a custom written quote.

Build your bathroom in 3D

Start from one of our designs

Six bathroom design options with suggested tile, vanities and fixtures.

Classic for older homes

Bungalow Classic

Classic for older homes. Marble-look tile, a hex mosaic floor, a vanity on legs and polished nickel.

Modern minimal

Clear Line

Modern minimal. Large-format porcelain, a floating vanity, frameless glass and a curbless shower.

Cost, timing and permits: questions homeowners ask

How much does a small or guest bathroom remodel cost?

The cost depends on whether it is a powder room or a full 5x8 bathroom with a tub or walk-in shower, tile versus wall panels, and your vanity and fixture selections. Keeping plumbing in place keeps the budget streamlined. We measure your room at a free visit and provide a firm written quote. See how pricing works.

How much does a 5x10 bathroom remodel cost?

We quote a 5x10 bathroom from your exact measurements at a free on-site visit, because the extra floor and wall area, longer vanity options and shower or tub choices set the final scope and finish quantities.

How much does a powder room or half bath remodel cost in Everett?

A powder room remodel is quoted around your vanity, toilet, mirror, lighting, flooring and any wall tile or wainscot details. Keeping the toilet and sink plumbing in place keeps the project fast (3 to 8 working days) and budget-friendly. See how pricing works.

Can you remodel a 5x8 bathroom without moving the plumbing?

Yes, and it is the usual plan. The tub or shower, the toilet and the vanity stay where the lines are, and everything around them is new. That keeps the cost down.

Can you redesign a small bathroom, not just swap the fixtures?

Yes. A small bathroom renovation starts with the layout: where the plumbing is, what has to fit and how the door swings. We measure, draw the new layout in 3D and settle the vanity size, the shower or tub and the lighting before you pick finishes. A guest bathroom gets the same steps. If you want a different layout, such as a shower in place of the tub, we price it in the same written scope.

How long does a small bathroom remodel take?

A powder room usually takes 3 to 8 working days on site. A full 5x8 bathroom in the same layout takes about 2 to 4 weeks. Permits, inspections and material delivery can add time; you get your own schedule with the written scope. See typical timelines

How long does a powder room remodel take?

A powder room usually takes 3 to 8 working days on site. Permits, inspections and material delivery can add time; you get your own schedule with the written scope. See typical timelines

Do I need a permit?

Usually not when the vanity and toilet stay in place. Moving plumbing or adding a circuit does need one; we check with your city and handle it.

Can you make a small powder room feel bigger?

A shallow or wall-hung vanity can leave more floor space. We can also review the mirror, lighting and door swing; a pocket door may help where an inward-swinging door interferes with the toilet.

Can I keep my toilet?

Yes. We can reset your existing toilet on a new wax ring, which lowers the price.

Is the work covered by a warranty?

Yes. Every bathroom has a written 2-year warranty from the final walkthrough. It covers our labor, the waterproofing and the tile we install. Caulk joints are covered for the first year only. Manufacturer defects in fixtures and materials fall under the manufacturer's warranty, and we help you file the claim. See what the warranty covers (opens in a new tab).

Rather talk it through?

Call us Mon–Sat, 9 am–8 pm, or request a free on-site consultation.

Free Shower Upgrade Package through Dec 31, 2026 (opens in a new tab)

Pick a day for your free on-site consultation

Choose a time window and we'll call to confirm.

What's included

  • Measurements and a look at your bathroom, at your home
  • 3D design of your new layout
  • Material selections that work together
  • A written scope and quote
  • Financing options through Wisetack
  • 2-year workmanship warranty

Prefer to talk? Call (425) 550-9475

Step 1 of 30% complete
Pick a day and time

Choose a time window for your free consultation. This is a request, not a booked appointment. We'll call to confirm.

Select a time window above.

Pacific Time. Morning 9 to 12, afternoon 12 to 4, evening 4 to 8.

Small bathrooms and powder rooms in Everett and Snohomish County

The 5x8 is a common full bathroom size in Puget Sound houses, often the hall bathroom in ramblers, split-levels and townhouses. A standard alcove tub is 60 inches long, so it fills the 5 ft wall end to end, and the 8 ft wall holds the toilet and the sink.

Plenty of homes around Everett, Mill Creek and Bothell have a half bath off the entry or the kitchen, often with the original vanity, a builder-grade toilet and sheet vinyl. It is the bathroom your guests use, and one of the simpler rooms in the house to update.

We keep the plumbing where it is whenever we can, which keeps the cost down. The vanity size, the door swing and the lighting decide how the room feels, so we plan those first and pick finishes after.

If the room has no fan or the one it has is noisy and weak, we can add or replace it; that is an option, priced on its own line in your scope.

ADD BATH is based on SE Everett Mall Way. We are a WA-registered contractor (L&I ADDBABL764KO), bonded and insured. We work across Snohomish County, from Everett, Mukilteo and Mill Creek to Lake Stevens and Marysville, and in North Seattle and on the Eastside (service area).

Focus on your project choices. Close this view to return to the page without losing your answers.

ADD BATHGet an estimateYour bathroom, your choices.

Choose your service and preferred consultation date. Close this view to return without losing your answers.

ADD BATHRequest a visitLet's make room for your project.