Bathroom with a freestanding tub, a wood-look accent wall, a black rain shower and patterned floor tile

ADD BATH remodeling & design

Primary & master bathroom remodel

We build the primary bathroom for two: a double vanity, a big shower and storage. The closet or dressing area next door can be added.

Get a free estimate

Free on-site consultation. We usually reply within an hour, Mon to Sat, 9 am to 8 pm.

or build your bathroom in 3DCall (425) 550-9475

5.0 on Google, 84 reviewsand 5.0 on Yelp, 18 reviews

OfferFree Shower Upgrade Package Through Dec 31, 2026 · Valid with financing. Offer details (opens in a new tab)

  • Google5.0(84 reviews)
  • Yelp5.0(18 reviews)
  • Louis M.March 2025 on Google

    Modern bathroom remodel

    Exceeded all my hopes for a modern bathroom! The design and execution were handled with such professionalism and thoughtfulness that I never felt overwhelmed by the renovation process.

  • Dovie R.March 2025 on Google

    Bathroom remodel

    I am thrilled with my bathroom remodel! The team was incredibly professional, and the end result is simply stunning!

  • MaxMay 2024 on Google

    New bathroom with a larger shower

    You used excellent materials to build my new bathroom... And they did it in ten days... You were able to make my shower larger and being as I'm a big guy I love it. They didn't make a mess during demo.

  • Ok S.May 2024 on Google

    Tub and shower renovation

    Vlad and team did a wonderful job, my tub and shower came out beautiful. They went above and beyond to make sure the finished product blended with the rest of my bathroom and left no mess behind.

  • Terea B.July 2025 on Google

    Subfloor and joist repair under a bathroom

    We discovered a soft spot on our bathroom floor... After the initial tear out, the damage was much more severe than expected. Dmitrii gave a second quote and took care of the problem... He is very professional, and he explained all as he went along.

What a primary bathroom remodel includes

A primary bathroom gets used by two people every morning, so we plan the shower, the vanity and the storage together. Keeping a tub and a separate shower? We plan clearances and plumbing so both fit the room. Your written scope lists every line; it usually covers:

  1. Custom quoteFree 3D & quotein-home measurements, 3D layout preview and line-by-line written scope
  2. Time on site1 to 3 monthslarge primary bathroom. Moving walls or hidden damage can add time
  3. WaterproofingFlood-testedwaterproof membrane, before the tile
  4. Double vanityTwo faucets and two mirrorsplus a toilet and accessories
  • Protection of floors and the path through your home, dust barriers and daily cleanup
  • Demolition and haul-away of the whole room
  • Framing and blocking, plumbing for a double vanity and a thermostatic valve with a hand shower
  • A new 20-amp circuit, recessed lights, sconces, a dimmer and GFCI outlets
  • Fan on a humidity switch; a heated floor with its own thermostat and a towel warmer
  • Waterproof membrane flood-tested before tile; tiled shower pan, bench and niche
  • Large-format wall tile, floor tile and metal trim
  • Double vanity with two faucets, two mirrors, a toilet and accessories
  • Frameless glass, paint, baseboards, door casings and a final walkthrough

A freestanding tub as well? We set it and run the plumbing for it; it is priced as an option. The dressing area or closet next door can be part of the same plan.

Planning a primary bathroom remodel?

Leave your name and number. We'll call to talk through your primary bathroom remodel and set up a free on-site consultation.

Prefer to talk? Call (425) 550-9475

Who does the work, and what to expect

Our remodeling team

Our bathroom remodeling team carries out the construction work. Licensed plumbers and electricians handle their trades.

Damage behind the walls

If we find rot or damage behind the tile, we stop, photograph it and show you. Your contract lists unit prices for common repairs.

Permits and inspections

When the valve or drain changes, the work usually needs a plumbing permit. We apply and book the inspection. Permits are priced separately.

Custom and spa-style bathrooms

We plan the shower, vanity, storage and clear space around the people who share the room. The measured layout determines which fixtures fit.

A custom tiled shower

Comfort and Premium put a custom tiled floor in the shower, with a bench, a niche and frameless glass. Premium adds a curbless entry. The details are on the shower remodeling page.

Two sinks and a big shower, planned together

An example of a primary bathroom with two sinks and a walk-in shower. Your own plan may include more or less than this room shows.

Conceptual 3D primary bathroom cutaway with a double vanity, two mirrors, sconces, a shower bench and niche, exposed waterproofing and a small floor-heating section
Conceptual cutaway. Layer thicknesses are exaggerated for clarity.
  1. Shower plumbing

    We set the valve and run the water lines to the shower head and hand shower while the wall is open, then connect the fixtures you picked.

  2. Frameless glass

    Frameless glass is made to fit, so we take the measurements once the tile is set, then install it.

  3. Shower bench

    We frame the bench and waterproof it along with the shower walls and floor, then flood-test before any tile goes on.

  4. Sconces

    We plan where the sconces go with you, run the wiring before the walls close, then mount them.

  5. Mirrors

    We settle on the mirror heights with you, in line with the sinks and sconces, then hang both mirrors once the paint is done.

  6. Double vanity

    We run the water and drain lines for two sinks, then set the vanity you picked and connect both faucets.

  7. Floor tile

    We lay out and set the large-format floor tile, with a heated floor and its own thermostat under it first if your plan has one.

Tubs, showers and double vanities we've built

Photos from ADD BATH projects.

Bathroom with a freestanding tub, a wood-look accent wall, a black rain shower and patterned floor tile
Freestanding tub, wood-look accent wall
White bathroom with a freestanding tub, a glass walk-in shower with black fixtures, marble-look tile and a window
Freestanding tub and glass shower
Floating wood-look double vanity with a long lit mirror and dark floor tile
Floating wood vanity, two sinks

See more of our projects

What a primary bathroom remodel costs

How it is quoted

Free written quotewith 3D design

For an 8x10 primary bathroom, at our Essential package: a walk-in shower on an acrylic base with 24x48 porcelain wall tile, a corner shelf and a factory glass door, a double vanity, a mirror and light, a new toilet, new floor tile, a fan on a humidity switch, paint and trim. Labor and rough materials at our Essential package level (the finish materials you pick are extra). Drawings, asbestos testing and permits are priced separately. A tiled shower with a bench and frameless glass, a heated floor, a freestanding tub, a larger room or moving fixtures move the number up.

Pay over time with Wisetack. 0% APR options for up to 12 months.* *Subject to credit approval. See terms

Timeline

How long it takes

A large primary bathroom usually takes 1 to 3 months on site. Permits, inspections and material delivery can add time; you get your own schedule with the written scope. See typical timelines Moving walls or hidden damage can add time.

What each package includes

Every primary bathroom includes demo and haul-away, framing touch-ups, new floor tile, a new fan on a humidity switch, GFCI outlets, baseboards, paint, towel bar and hooks, project management and final cleanup. Each package sets what goes in the room and raises the grade of rough materials (waterproofing, fan, switches, paint). Each package below shows a sample 8x10 primary bathroom layout (with optional freestanding soaking tub) and is tailored to your exact room during the free consultation.

Essential

Clean & durableFree written quote

  • Acrylic shower base
  • Standard valve and shower head
  • Corner shelf, no niche
  • Factory glass door or a curtain

Finish materials selected with you at consultation

Comfort

Most popularFree written quote

  • Custom tiled shower floor
  • Frameless glass, niche and bench
  • Hand shower, thermostatic valve
  • Heated floor, recessed lights, towel warmer

Finish materials selected with you at consultation

Premium

Custom & spaFree written quote

  • Curbless tiled shower
  • Frameless glass, niche and bench
  • Rain head, hand shower, thermostatic valve
  • Heated floor, lights, LED mirrors

Finish materials selected with you at consultation

Design your bathroom in 3D.

Pick your room size, layout, style and fixtures in our 3D builder, then request a custom written quote.

Build your bathroom in 3D

Start from one of our designs

Six bathroom design options with suggested tile, vanities and fixtures.

Modern minimal

Clear Line

Modern minimal. Large-format porcelain, a floating vanity, frameless glass and a curbless shower.

Classic for older homes

Bungalow Classic

Classic for older homes. Marble-look tile, a hex mosaic floor, a vanity on legs and polished nickel.

Cost, layout and timing: questions homeowners ask

How much does a primary bathroom remodel cost in Everett?

A primary bathroom remodel depends on room dimensions, shower build (curbed vs. curbless, bench, niches, frameless glass), double vanity and cabinetry, freestanding tub, heated floors, and any layout or wall changes. We measure your room at a free consultation, build a 3D layout and provide a firm, line-by-line written quote. See how pricing works.

Is a primary bathroom the same as a master bathroom?

Yes. Primary bathroom is the newer name for the master bathroom, the one that belongs to the main bedroom, also called an ensuite. Whether you call it a primary bathroom remodel, a primary bathroom renovation or a master bathroom remodel, it is the same project. Adding a new ensuite where there is none is a different job: see bedroom ensuite addition.

Can you build a double vanity in a primary bathroom?

Yes. A double vanity is part of our standard primary bathroom scope, and we plan the plumbing for two sinks with the rest of the room. If you only want to replace the vanity and keep the rest of the bathroom, see bathroom vanity installation.

Can you build a custom or luxury primary bathroom?

Yes. Our Comfort and Premium build levels cover custom tiled shower floors with benches, niches and frameless glass, heated tile floors, and at Premium a curbless entry, ceiling rain head and backlit LED mirrors. Every custom primary suite is designed in 3D and quoted line by line after we inspect your room.

Can we keep a tub and add a separate shower?

Often. It depends on the room's size and where the drain and joists run. We check both at the first visit and show you a layout before you decide.

Is a heated floor worth it?

Yes — homeowners in the Pacific Northwest love warm tile on cold mornings. A heated floor runs on its own programmable thermostat and dedicated circuit; it is included in our Comfort and Premium packages and available as an upgrade on any remodel.

Can the closet or dressing area be part of the project?

Yes. Walls, doors and storage next to the bathroom can be planned together. Changes to walls usually need a permit, which we handle.

How long will my bathroom be out of service?

A large primary bathroom usually takes 1 to 3 months on site. Permits, inspections and material delivery can add time; you get your own schedule with the written scope. See typical timelines Moving walls or hidden damage can add time.

Is the work covered by a warranty?

Yes. Every bathroom has a written 2-year warranty from the final walkthrough. It covers our labor, the waterproofing and the tile we install. Caulk joints are covered for the first year only. Manufacturer defects in fixtures and materials fall under the manufacturer's warranty, and we help you file the claim. See what the warranty covers (opens in a new tab).

Rather talk it through?

Call us Mon–Sat, 9 am–8 pm, or request a free on-site consultation.

Free Shower Upgrade Package through Dec 31, 2026 (opens in a new tab)

Pick a day for your free on-site consultation

Choose a time window and we'll call to confirm.

What's included

  • Measurements and a look at your bathroom, at your home
  • 3D design of your new layout
  • Material selections that work together
  • A written scope and quote
  • Financing options through Wisetack
  • 2-year workmanship warranty

Prefer to talk? Call (425) 550-9475

Step 1 of 30% complete
Pick a day and time

Choose a time window for your free consultation. This is a request, not a booked appointment. We'll call to confirm.

Select a time window above.

Pacific Time. Morning 9 to 12, afternoon 12 to 4, evening 4 to 8.

Primary and master bathrooms in Everett and Snohomish County

Many primary bathrooms in Mill Creek, Bothell and Snohomish homes from the 1990s and 2000s have a corner garden tub nobody uses, a small shower with a fiberglass pan and one long vanity with a single sink. A remodel usually trades the tub for a larger tiled shower and gives each person a sink and storage.

We plan the lighting in layers, recessed lights for the room and sconces at the mirror, and put the bathroom on its own circuit so a heated floor and a towel warmer run without tripping a breaker.

When the valve or drain changes, the work usually needs a plumbing permit, and in several cities around here any tub or shower replacement needs one. Inside Everett city limits that is the City of Everett; in unincorporated Snohomish County it is Planning and Development Services. We apply and book the inspection; the permit is priced separately. Before we open walls, a certified inspector checks for asbestos, as the Puget Sound Clean Air Agency requires for contractor work in the region; that test is priced separately too.

ADD BATH is based on SE Everett Mall Way. We are a WA-registered contractor (L&I ADDBABL764KO), bonded and insured. We work across Snohomish County, from Everett, Mukilteo and Mill Creek to Lake Stevens and Marysville, and in North Seattle and on the Eastside (service area).

Focus on your project choices. Close this view to return to the page without losing your answers.

ADD BATHGet an estimateYour bathroom, your choices.

Choose your service and preferred consultation date. Close this view to return without losing your answers.

ADD BATHRequest a visitLet's make room for your project.