Renovated bathroom with a tiled shower, black sliding-glass hardware and a toilet

ADD BATH remodeling & design

Tub-to-shower conversion

We replace the tub with a tiled shower in the same alcove. The waterproofing is flood-tested before tile.

Get a free estimate

Free on-site consultation. We usually reply within an hour, Mon to Sat, 9 am to 8 pm.

or build your bathroom in 3DCall (425) 550-9475

5.0 on Google, 84 reviewsand 5.0 on Yelp, 18 reviews

OfferFree Shower Upgrade Package Through Dec 31, 2026 · Valid with financing. Offer details (opens in a new tab)

  • Google5.0(84 reviews)
  • Yelp5.0(18 reviews)
  • Ok S.May 2024 on Google

    Tub and shower renovation

    Vlad and team did a wonderful job, my tub and shower came out beautiful. They went above and beyond to make sure the finished product blended with the rest of my bathroom and left no mess behind.

  • MaxMay 2024 on Google

    New bathroom with a larger shower

    You used excellent materials to build my new bathroom... And they did it in ten days... You were able to make my shower larger and being as I'm a big guy I love it. They didn't make a mess during demo.

  • Louis M.March 2025 on Google

    Modern bathroom remodel

    Exceeded all my hopes for a modern bathroom! The design and execution were handled with such professionalism and thoughtfulness that I never felt overwhelmed by the renovation process.

  • Dovie R.March 2025 on Google

    Bathroom remodel

    I am thrilled with my bathroom remodel! The team was incredibly professional, and the end result is simply stunning!

  • Terea B.July 2025 on Google

    Subfloor and joist repair under a bathroom

    We discovered a soft spot on our bathroom floor... After the initial tear out, the damage was much more severe than expected. Dmitrii gave a second quote and took care of the problem... He is very professional, and he explained all as he went along.

What a tub-to-shower conversion includes

A bathtub-to-shower conversion takes out the tub and builds a tiled shower in the same alcove. The vanity, toilet and floor stay unless you want to change them. Your written scope lists every line; it usually covers:

  1. Custom quoteFree on-sitemeasured in your home with a 3D preview and line-by-line written scope
  2. Time on siteAbout 7 to 9 working dayswhen there is no serious water damage and no plumbing to move or repair
  3. WaterproofingFlood-testedwaterproof membrane, before any tile
  4. Glass timingGlass 1 to 3 weeks latermeasured after the tile is set
  • Protection of floors and the path through your home, dust barriers and daily cleanup
  • Tub and surround removed and hauled away
  • Framing and blocking for the valve, niche and future grab bars
  • New shower valve, and the tub drain converted to a 2-inch shower drain
  • Backer board and a waterproof membrane, flood-tested before tile
  • Sloped tiled shower pan with a curb and a mosaic floor
  • Large-format wall tile, a tiled niche and metal edge trim
  • Framed or semi-frameless glass door
  • Caulk, cleanup and a final walkthrough

Would you rather keep a tub? See bathtub replacement for a new tub with acrylic wall panels or a tiled surround, or full bathroom remodeling to redo the whole room. Want walls with few seams and no grout lines? See shower wall panels. Want a bench or a curbless entry? See shower remodeling.

Thinking about a tub-to-shower conversion?

Tell us about your room, and we'll call to set up a free on-site consultation.

Who does the work, and what to expect

  • Our remodeling team. We handle demolition, preparation, fixtures and finishes. Licensed plumbers and electricians handle the plumbing and electrical work.
  • Damage behind the walls. Wallboard under an old tub is often soaked at the corners. We open it up, show you what we find and fix it before the new shower goes in.
  • Permits and inspections. When the work needs a permit, we apply for it and book the inspection. Permits and asbestos testing are priced separately.

What changes where the tub was

The tub alcove becomes a shower. These cutaways show the change while the vanity and toilet stay in place.

BeforeConceptual before view with an intact cream alcove tub, older round-bowl toilet, honey-oak vanity, mirrored medicine cabinet, brass vanity light, warm off-white drywall and a worn-through hole in the linoleum.
An older bathroom with a cream acrylic tub, dated fixtures and worn linoleum.
AfterAfter conversion: light marble-look wall tile, a small hex mosaic shower floor, glass door and a connected drain P-trap.
After conversion: light marble-look wall tile, a small hex mosaic shower floor, glass door and a connected drain P-trap.

Tub-to-shower conversion: before and after.

  1. Valve and head

    We frame the wall for the new valve and connect the shower head you choose.

  2. Niche and walls

    We waterproof the walls before any tile goes up, and the niche is built in and tiled with the rest of the shower.

  3. Glass door

    We measure for the glass after the tile is set, install the door and finish the joints with caulk.

  4. Drain and pan

    We convert the old tub drain to a shower drain and slope a new tiled pan to it, with a curb at the entry.

  5. What stays

    The vanity and toilet stay where they are unless you want them changed, and we work around them.

Photos from our shower projects

What a tub-to-shower conversion costs

How it is quoted

Free written quoteafter an on-site visit

What it covers. For a standard 5-foot tub alcove: tub out, a tiled shower pan with a curb, 24x48 wall tile, a niche, a new valve, the drain converted to 2 inches and a framed glass door. Labor and rough materials at our Essential package level (the finish materials you pick are extra). Asbestos testing and permits are priced separately.

What moves it up. Bigger tile, a bench, a curbless entry or frameless glass. The tub-to-shower conversion cost guide goes through what else changes the price.

Pay over time with Wisetack. 0% APR options for up to 12 months.* *Subject to credit approval. See terms

Timeline

How long it takes

About 7 to 9 working days on site for a tub-to-shower conversion or walk-in shower, when there is no serious water damage and no plumbing to move or repair. Permits, inspections and material delivery can add time. See typical timelines

Glass is measured after tile and installed 1 to 3 weeks later; see shower door installation for the door options. You can shower before it arrives with a temporary curtain.

Design your bathroom in 3D.

Pick your room size, layout, style and fixtures in our 3D builder, then request a custom written quote.

Build your bathroom in 3D

Start from one of our designs

Six bathroom design options with suggested tile, vanities and fixtures.

Modern minimal

Clear Line

Modern minimal. Large-format porcelain, a floating vanity, frameless glass and a curbless shower.

Classic for older homes

Bungalow Classic

Classic for older homes. Marble-look tile, a hex mosaic floor, a vanity on legs and polished nickel.

Cost, timing, permits and warranty questions

Can you replace my bathtub with a shower?

Yes. A bathtub-to-shower conversion takes out the tub and its surround and builds a tiled shower in the same alcove: a new valve, the tub drain converted to a 2-inch shower drain, a sloped pan, a waterproof membrane that is flood-tested before tile, wall tile, a niche and a glass door. The vanity and toilet stay unless you want them changed. If you want a tub again instead, see bathtub replacement.

How much does a tub-to-shower conversion cost in Everett?

The cost depends on whether you choose porcelain tile or grout-free wall panels, an acrylic shower base or custom tiled pan, framed or frameless glass, options like a bench or niche, and any repairs uncovered behind the old tub. We measure your alcove at a free on-site visit and provide a firm, line-by-line written quote. See what affects conversion cost and how pricing works.

Will removing my only bathtub hurt resale value?

It depends on the house. Families with small children often look for at least one tub. If you have a second bathroom with a tub, converting the main bathroom to a walk-in shower is rarely a problem. If it is the only tub, we will talk through the trade-off before you decide.

Can I convert my tub to a walk-in shower with a low curb or no curb?

Yes. A low curb works in most alcoves. Curbless means recessing the subfloor so the floor slopes to the drain; it costs more and depends on the joists, so we check them at the first visit. See shower remodeling.

How long will I be without a shower?

A tub-to-shower conversion or walk-in shower takes about 7 to 9 working days on site when there is no serious water damage and no plumbing to move or repair. Permits, inspections and material delivery can add time; you get your own schedule with the written scope. See typical timelines Glass is measured after tile and installed 1 to 3 weeks later; you can shower before it arrives with a temporary curtain.

Do I need a permit?

Usually, when the valve or drain changes, and several cities require one for any tub or shower replacement. We apply for it and book the inspection; the permit is priced separately.

Is the work covered by a warranty?

Yes. Every bathroom has a written 2-year warranty from the final walkthrough. It covers our labor, the waterproofing and the tile we install. Caulk joints are covered for the first year only. Manufacturer defects in fixtures and materials fall under the manufacturer's warranty, and we help you file the claim. See what the warranty covers (opens in a new tab).

Rather talk it through?

Call us Mon–Sat, 9 am–8 pm, or request a free on-site consultation.

Free Shower Upgrade Package through Dec 31, 2026 (opens in a new tab)

Pick a day, and we come to you

Pick a day and a time window for a free on-site consultation. We'll call to confirm.

What's included

  • Measurements and a look at your bathroom, at your home
  • 3D design of your new layout
  • Material selections that work together
  • A written scope and quote
  • Financing options through Wisetack
  • 2-year workmanship warranty

Prefer to talk? Call (425) 550-9475

Step 1 of 30% complete
Pick a day and time

Choose a time window for your free consultation. This is a request, not a booked appointment. We'll call to confirm.

Select a time window above.

Pacific Time. Morning 9 to 12, afternoon 12 to 4, evening 4 to 8.

Tub-to-shower conversions in Everett and Snohomish County

In a lot of split-levels and ramblers from the 1960s to the '80s around Everett, Lynnwood and Mill Creek, the main bathroom has a 5-foot tub that mostly gets used for showers. If the house has a second bathroom with a tub, turning that alcove into a walk-in shower makes the room easier to use every day.

Under the old tub there is often more going on than you'd expect: a steel or cast-iron tub, a 1.5-inch drain that has to become 2 inches for a shower, and wallboard that has been soaking up water at the corners for years. We open it up, show you what we find and fix it before the new shower goes in.

A shower needs ventilation to dry between uses. If the fan is undersized or vents into the attic, we include a replacement or duct repair in the scope.

When the valve or drain changes, the work usually needs a plumbing permit, and in several cities around here any tub or shower replacement needs one. Inside Everett city limits that is the City of Everett; in unincorporated Snohomish County it is Planning and Development Services. We apply and book the inspection; the permit is priced separately. Before we open walls, a certified inspector checks for asbestos, as the Puget Sound Clean Air Agency requires for contractor work in the region; that test is priced separately too.

ADD BATH is based on SE Everett Mall Way. We are a WA-registered contractor (L&I ADDBABL764KO), bonded and insured. We work across Snohomish County, from Everett, Mukilteo and Mill Creek to Lake Stevens and Marysville, and in North Seattle and on the Eastside (service area).

Focus on your project choices. Close this view to return to the page without losing your answers.

ADD BATHGet an estimateYour bathroom, your choices.

Choose your service and preferred consultation date. Close this view to return without losing your answers.

ADD BATHRequest a visitLet's make room for your project.