Ways to add a bathroom
How additions are quoted: Every bathroom addition is evaluated on site for drain routing, framing, electrical capacity and city permits before we prepare a firm written quote.
Basement bathroom addition
A pump, if you need one, is priced after the visit.
Bathroom in the garage
Insulation, heat and the sewer route if the main line is far away are priced after the visit.
Closet to bathroom conversion
Moving the closet storage and a longer drain run are priced after the visit.
Add a bathroom to a bedroom
A longer drain run, moving a closet and more electrical if the panel is full are priced after the visit.
Laundry to bathroom conversion
Moving the washer and dryer hookups and a longer drain run are priced after the visit.
Attic bathroom addition
Stairs, a dormer if the headroom is short, more floor framing and heat are priced after the visit.
Half bath / powder room addition
A longer drain run and a pump, if the spot is below the main drain, are priced after the visit.
We handle demolition, preparation, fixtures and finishes. Licensed plumbers and electricians handle the plumbing and electrical work. About ADD BATH
A new bathroom needs building, plumbing and electrical permits. We draw the layout and permit drawings, apply and book the inspections.
From basement laundry to a bathroom
An example of turning an existing basement laundry into a bathroom with a shower. Both views show the same room footprint.


Basement bathroom addition: before and after.
Shower lines
New water and drain lines run to the shower, and we connect the valve and shower head you picked.
New wiring
The electrical panel gets checked for room before we run new wiring for the lights, fan and outlets.
New walls
We frame the new walls and get the pipes and wiring in place inside them before they are closed up.
Toilet drain
We plan the drain route with the slope and venting a toilet needs, then set and connect the toilet.
New floor
We check the floor framing or slab first, and the new floor goes in once the walls and lines are done.
Where could a new bathroom go?
We check possible bathroom locations against existing water, drain and vent lines. The distance to those connections, available floor space and structural work affect the scope and price.
Before you commit, we visit, check the space and map the plumbing, ventilation and electrical routes. You get a clear answer about what fits, what it will take and what permits are needed.
Common places to add a bathroom
Closet or storage room
A deep closet can often hold a half bath or a compact shower bath.
Closet to bathroomLaundry room
Water and drain lines are already there, so a laundry room is often the easiest conversion. The washer and dryer move or stack nearby.
Laundry to bathroomBasement
Plan around drain depth: some basements need an upflush or ejector system. Moisture control and ceiling height matter too.
Basement bathroomGarage
Useful for a mudroom bath or rental unit. Insulation, heat, ventilation and the sewer route decide the scope.
Garage bathroomAttic
Check headroom, floor strength and how the drain will reach the stack before choosing fixtures.
Attic bathroomBedroom ensuite
Take part of a large bedroom or closet to create a private bathroom, while keeping the bedroom usable.
Bedroom ensuiteWhat we check before you decide
- Distance to the main drain stack and whether the drain can slope properly
- How the new fixtures will be vented
- Supply line routes and water heater capacity
- Exhaust fan duct route to the outside
- Electrical panel capacity for a new circuit, lights and GFCI outlets
- Floor framing, especially under a tub or tiled shower
- Ceiling height and door clearances
- Permits: a new bathroom needs building, plumbing and electrical permits in most cities we serve
What to expect from the permit process: bathroom permits guide.
Add a bathroom in the garage
A garage bathroom may serve a workshop, mudroom, guest space or rental. The scope can include cutting the slab for drains, insulating walls and adding heat. We check the sewer route before pricing: a longer run can add work and cost.
What it costs
Typical scope. For a shower bath in an attached garage: two new walls, about 40 sq ft of slab cut and patched for the new lines, an acrylic shower with a glass door, a fan ducted outside, a new circuit, two recessed lights, drywall, vinyl plank floor, vanity, toilet, door and paint. Labor and rough materials at our Essential package level (the finish materials you pick are extra). Drawings, asbestos testing and permits are priced separately. Tile instead of acrylic, a larger room or the items above move the number up.
Priced after the site visit
Insulation and heat, closing in the garage door opening, and the sewer route if the main line is far away.
Closet to bathroom conversion
A deep hall or bedroom closet can often hold a half bath or a compact shower bath. The best ones sit over or next to an existing bathroom, so the new drain only has a short way to go. We look at the floor framing, the drain route and where the fan can vent outside before you decide, and we plan where the storage you lose will go.
What it costs
Typical scope. For a large closet turned into a compact shower bath: one new wall, new drain, vent and supply lines, an acrylic shower with a glass door, a fan ducted outside, a new circuit, two recessed lights, drywall, vinyl plank floor, vanity, toilet, door and paint. Labor and rough materials at our Essential package level (the finish materials you pick are extra). Drawings, asbestos testing and permits are priced separately. Tile instead of acrylic, a larger room or the items above move the number up.
Priced after the site visit
Moving the closet storage somewhere else and a longer drain run.
Bedroom ensuite addition
A private bathroom off a bedroom helps when a parent moves in, when teenagers share one hall bath, or when you want a true primary suite in an older house. In many Snohomish County homes the best spot is a large closet or the wall the bedroom shares with the existing bathroom. We keep the bedroom usable: the door swing, the bed wall and the closet are part of the plan, not an afterthought.
What it costs
Typical scope. For a compact shower bath carved out of a bedroom: two new walls, new drain, vent and supply lines, an acrylic shower with a glass door, a fan ducted outside, a new circuit, two recessed lights, drywall, vinyl plank floor, vanity, toilet, door and paint. Labor and rough materials at our Essential package level (the finish materials you pick are extra). Drawings, asbestos testing and permits are priced separately. Tile instead of acrylic, a larger room or the items above move the number up.
Priced after the site visit
A longer drain run, moving a closet and more electrical if the panel is full. Already have an ensuite you want to update? See primary bathroom remodel.
Laundry room to bathroom conversion
A laundry room already has water and drainage connections, which can reduce the plumbing needed for a bathroom addition. We check where the washer and dryer can move or stack and plan both areas together.
What it costs
Typical scope. For a laundry room turned into a shower bath, with water and drain lines already there: new drain, vent and supply lines for the fixtures, an acrylic shower with a glass door, a fan ducted outside, a new circuit, two recessed lights, drywall, vinyl plank floor, vanity, toilet, door and paint. Labor and rough materials at our Essential package level (the finish materials you pick are extra). Drawings, asbestos testing and permits are priced separately. Tile instead of acrylic, a larger room or the items above move the number up.
Priced after the site visit
Moving the washer and dryer hookups, and a longer drain run. Only updating the laundry room? See laundry room remodeling.
Attic bathroom addition
Many older homes around Everett have a finished attic or a bonus room upstairs with no bathroom on that floor. A new bathroom there needs floor framing strong enough for a shower and a drain route down to the main stack. Attics also run warm in summer and cold in winter, so ventilation and heat are part of the plan from the start.
What it costs
Typical scope. For a shower bath in a finished attic with enough headroom: two new walls, six floor joists sistered under the bathroom, new drain, vent and supply lines, an acrylic shower with a glass door, a fan ducted outside, a new circuit, two recessed lights, drywall, vinyl plank floor, vanity, toilet, door and paint. Labor and rough materials at our Essential package level (the finish materials you pick are extra). Drawings, asbestos testing and permits are priced separately. Tile instead of acrylic, a larger room or the items above move the number up.
Priced after the site visit
Stairs, a dormer if the headroom is short, more floor framing and heat.
Add a half bath or powder room
A half bath is often the easiest way to take pressure off the only full bathroom in a house. In a lot of split-levels and ramblers around Everett and Lynnwood, there is a hall closet or the space under the stairs right above or next to the existing drain lines. A toilet needs a 3-inch drain with proper slope and venting, so where the lines run decides what fits. We map the route and show you the layout before you decide.
What it costs
Typical scope. For a toilet and sink in a new spot close to existing lines: one new wall, new drain and supply lines, a fan ducted outside, a new circuit, drywall, vinyl plank floor, vanity, toilet, door and paint. Labor and rough materials at our Essential package level (the finish materials you pick are extra). Drawings, asbestos testing and permits are priced separately. A larger room or the items above move the number up.
Priced after the site visit
A longer drain run, a pump if the spot is below the main drain, and more electrical if the panel is full. Already have a powder room? See powder room remodeling.
What it costs to add a bathroom
Labor and rough materials at our Essential package level (the finish materials you pick are extra), before Washington sales tax. Drawings, asbestos testing and permits are priced separately. Each one assumes the new bathroom sits close enough to the main drain for gravity drainage.
- Half bath / powder room addition: quoted after site review
- Laundry to bathroom conversion: quoted after site review
- Closet to bathroom conversion: quoted after site review
- Add a bathroom to a bedroom: quoted after site review
- Basement bathroom addition: quoted after site review
- Bathroom in the garage: quoted after site review
- Attic bathroom addition: quoted after site review
Priced after the site visit: an ejector or upflush pump, long drain or sewer runs, insulation and heat, stairs or a dormer, a panel upgrade and moving washer and dryer hookups.
Pay over time with Wisetack. 0% APR options for up to 12 months.* *Subject to credit approval. See terms
Questions about adding a bathroom
How much does it cost to add a bathroom?
The cost depends on where the new bathroom goes (half bath, laundry conversion, closet, bedroom ensuite, garage, basement or attic), how far the new drain must run to the main line, structural framing, permits and your finish selections. We evaluate the space on site and put the exact scope and price in writing before any work starts.
Does adding a bathroom add value to my home?
Usually, especially in a home with one bathroom for three or more bedrooms. Remodeling's Cost vs. Value report for Seattle shows a midrange bathroom addition recovering roughly 40% of its cost at resale, but the daily-life value for a growing or multigenerational household is often the bigger reason.
Can a toilet go anywhere?
Not anywhere. A toilet needs a 3-inch drain with proper slope and venting. If gravity drainage is not possible, an upflush system can work in basements and some other spaces. We will tell you which option fits after looking at the space.
How long does a bathroom addition take?
Plan on about 1 to 6 months from design to finish for an addition or converted space; design and permit review take much of that time. Lynnwood and some other cities require plan review for interior remodels, which adds a few weeks.
Do I need an architect?
For most interior conversions, no. We prepare the layout and permit drawings. Structural changes or exterior additions may need an engineer, and we will tell you early if yours does.
Do I need a permit to add a bathroom?
Yes. A new bathroom needs building, plumbing and electrical permits, and some cities also require plan review. We prepare the layout and permit drawings, apply and book the inspections. Drawings, asbestos testing and permits are priced separately, and the permit fees are listed in your written quote. Our bathroom permits guide explains how the process works in Washington.
Is a garage bathroom allowed?
Usually, with permits. The bathroom needs heat, insulation and ventilation like any other room, and the drain has to reach the sewer line. We check the route and your city's rules at the first visit.
Is my closet big enough?
A toilet and a small sink fit in roughly 3 by 5 feet; a shower bath needs more, often around 5 by 7. We measure and sketch it at the first visit.
Will I lose much of the bedroom?
A compact shower bath usually takes around 5 by 8 feet, often from a large closet or the end of the room. We sketch the layout so you see what stays before you decide.
Where do the washer and dryer go?
We stack them in a closet, move them to the garage or basement, or keep them in the new bathroom behind doors. It depends on the space and where the hookups can go.
Is there enough headroom?
We measure at the first visit. The code needs enough height over the toilet, the sink and the shower; where the roof is low, a dormer or a different layout can solve it.
Where can a half bath go?
Under the stairs, in a hall closet or next to the kitchen or laundry. The closer it is to existing drain lines, the simpler and cheaper it is. We check the route at the first visit.
Does a new bathroom need a window?
It needs ventilation. A fan ducted outdoors is part of the price; a window is an option where the wall allows it.
Is the work covered by a warranty?
Yes. Every bathroom has a written 2-year warranty from the final walkthrough. It covers our labor, the waterproofing and the tile we install. Caulk joints are covered for the first year only. Manufacturer defects in fixtures and materials fall under the manufacturer's warranty, and we help you file the claim. See what the warranty covers (opens in a new tab).