Walk-in shower with marble-look walls, a built-in bench, a long recessed niche and large gray floor tile

ADD BATH remodeling & design

Shower remodeling & custom walk-in showers

We take the old shower down to the studs and rebuild it as a tiled walk-in. The waterproofing is flood-tested before tile.

Get a free estimate

Free on-site consultation. We usually reply within an hour, Mon to Sat, 9 am to 8 pm.

or build your bathroom in 3DCall (425) 550-9475

5.0 on Google, 84 reviewsand 5.0 on Yelp, 18 reviews

OfferFree Shower Upgrade Package Through Dec 31, 2026 · Valid with financing. Offer details (opens in a new tab)

  • Google5.0(84 reviews)
  • Yelp5.0(18 reviews)
  • MaxMay 2024 on Google

    New bathroom with a larger shower

    You used excellent materials to build my new bathroom... And they did it in ten days... You were able to make my shower larger and being as I'm a big guy I love it. They didn't make a mess during demo.

  • Ok S.May 2024 on Google

    Tub and shower renovation

    Vlad and team did a wonderful job, my tub and shower came out beautiful. They went above and beyond to make sure the finished product blended with the rest of my bathroom and left no mess behind.

  • Louis M.March 2025 on Google

    Modern bathroom remodel

    Exceeded all my hopes for a modern bathroom! The design and execution were handled with such professionalism and thoughtfulness that I never felt overwhelmed by the renovation process.

  • Dovie R.March 2025 on Google

    Bathroom remodel

    I am thrilled with my bathroom remodel! The team was incredibly professional, and the end result is simply stunning!

  • Brian W.October 2025 on Google

    Shower leak and water damage repair

    Dimitri came to repair my bathroom and closet from water damage and a leaking shower. He is easy to work with and has good quality craftsmanship.

What a walk-in shower remodel includes

We take the old shower down to the studs and rebuild it: a new pan, waterproofing, tile and glass, planned around how you use the room. Your written scope lists every line; it usually covers:

  1. Custom quoteFree on-sitemeasured in your home with a 3D preview and line-by-line written scope
  2. Time on siteAbout 7 to 9 working dayswhen there is no serious water damage and no plumbing to move or repair
  3. WaterproofingFlood-testedwaterproof membrane, before any tile
  4. Glass timingGlass 1 to 3 weeks latermeasured after the tile is set
  • Protection of floors and the path through your home, dust barriers and daily cleanup
  • Old shower pan, walls and glass removed and hauled away
  • Framing and blocking for the valve, niche, bench and future grab bars
  • New shower valve and drain
  • Backer board and a waterproof membrane, flood-tested before tile
  • Sloped tiled shower pan with a low curb and a mosaic floor
  • Large-format wall tile, a tiled niche and metal edge trim
  • Framed or semi-frameless glass door
  • Caulk, cleanup and a final walkthrough

Options that change the price: a tiled bench or a fold-down seat, a linear drain, a curbless entry, frameless glass, a rain head or a hand shower on a slide bar. Replacing a tub? See tub-to-shower conversion.

Ready for a walk-in shower?

Tell us about your room, and we'll call to set up a free on-site consultation.

Who does the work, and what to expect

  • Our remodeling team. We handle demolition, preparation, fixtures and finishes. Licensed plumbers and electricians handle the plumbing and electrical work.
  • Damage behind the walls. When we open the old shower, we check three things first: whether the pan has leaked, whether the subfloor has gone soft, and what holds the wall tile besides old grout.
  • Permits and inspections. When the work needs a permit, we apply for it and book the inspection. Permits and asbestos testing are priced separately.

Shower remodel or shower replacement: which job is yours?

Most shower projects are one of four jobs. Each has its own page with prices, photos and answers.

  • A custom walk-in shower. Down to the studs: a new pan or a curbless floor, waterproofing, tile, a niche, a bench and glass. That is this page.
  • Replacing an old shower. Out with the worn fiberglass stall or the tiled shower that leaks, in with a new one in the same spot. We rebuild it in tile, or fit shower wall panels over cement board if you want few seams to clean.
  • A tub that should be a shower. Tub-to-shower conversion takes out the tub and builds a shower in the same alcove.
  • New glass on a shower you like. A new door or enclosure on its own: see shower door installation.

Would you rather keep a tub? See bathtub replacement.

A closer look at the shower

An example of the shower features we plan with you. The bench, linear drain, rain head and frameless glass shown here are options.

Conceptual 3D shower cutaway with a tiled bench, niche, rain head and hand shower, frameless glass, a linear drain and a P-trap below the floor
Conceptual cutaway. Layer thicknesses are exaggerated for clarity.
  1. Shower head

    We set the new valve in the wall while it is open, then connect the rain head and hand shower you choose.

  2. Niche

    The niche is framed into the wall, then waterproofed and tiled along with the walls around it.

  3. Bench

    If you want a bench, we frame it to fit your room, waterproof it with the shower and finish it to match the walls.

  4. Shower floor

    We slope the floor to the drain, linear or standard, and flood-test the waterproofing before any tile goes down.

  5. Glass panel

    Once the tile is set, we measure for the glass, then install it against the finished walls and floor.

Photos from our shower projects

What a shower replacement costs

How it is quoted

Free written quoteafter an on-site visit

What it covers. For a standard 5-foot shower: the old shower out, a tiled pan with a low curb, 24x48 wall tile, a niche, a new valve and drain and a framed glass door. Labor and rough materials at our Essential package level (the finish materials you pick are extra). Asbestos testing and permits are priced separately.

What moves it up. A bench, a linear drain, a curbless entry or frameless glass. The shower remodel and replacement cost guide goes through what else changes the price.

Pay over time with Wisetack. 0% APR options for up to 12 months.* *Subject to credit approval. See terms

Timeline

How long it takes

About 7 to 9 working days on site for a tub-to-shower conversion or walk-in shower, when there is no serious water damage and no plumbing to move or repair. Permits, inspections and material delivery can add time. See typical timelines

Glass is measured after tile and installed 1 to 3 weeks later; you can shower before it arrives with a temporary curtain.

Design your bathroom in 3D.

Pick your room size, layout, style and fixtures in our 3D builder, then request a custom written quote.

Build your bathroom in 3D

Start from one of our designs

Six bathroom design options with suggested tile, vanities and fixtures.

Modern minimal

Clear Line

Modern minimal. Large-format porcelain, a floating vanity, frameless glass and a curbless shower.

Classic for older homes

Bungalow Classic

Classic for older homes. Marble-look tile, a hex mosaic floor, a vanity on legs and polished nickel.

Cost, bench, timing and warranty questions

How much does a walk-in shower remodel or replacement cost in Everett?

The cost depends on your shower size, acrylic base versus custom tiled pan or curbless entry, tile selection, custom bench or niches, framed versus custom frameless glass, and any repairs behind the walls. We measure your shower at a free on-site visit and provide a firm, line-by-line written quote. See what affects shower cost and how pricing works.

Is a bathroom shower remodel the same as a shower replacement?

Nearly. A remodel can change the size, the entry or where things sit; a replacement puts a new shower where the old one was. Either way we take the old shower out, check the subfloor and the walls, and rebuild to a written scope. A tiled shower gets a waterproof membrane that is flood-tested before tile.

Do you install only the shower glass?

Yes. If the shower itself is in good shape, we can measure and install a new glass door or enclosure on its own. See shower door installation for how that works.

Can you build a custom tile shower?

Yes. A custom tile shower starts with a sloped pan and a waterproof membrane that is flood-tested before any tile goes down. Then come wall tile in the size and pattern you pick, a tiled niche and the glass. A bench, a linear drain, a curbless entry and frameless glass are options. Tile costs more than shower wall panels, which have fewer pattern and niche choices but fewer seams to clean.

Can you make it curbless?

Often, yes. We recess the subfloor so the floor slopes to the drain with no step. It depends on the joists and what is underneath, so we check that at the first visit. It costs more than a low curb.

Can you make my shower larger?

Usually, if there is room to move a wall or take over a closet or tub space. Moving walls or the drain makes it a bigger project, and we show you what each option involves before you decide.

A tiled bench or a fold-down seat?

A tiled bench is built in and waterproofed with the shower. A fold-down seat folds flat against the wall when you don't need it, which suits a smaller shower. We add blocking for either one.

How long does a walk-in shower installation take?

A tub-to-shower conversion or walk-in shower takes about 7 to 9 working days on site when there is no serious water damage and no plumbing to move or repair. Permits, inspections and material delivery can add time; you get your own schedule with the written scope. See typical timelines Glass is measured after tile and installed 1 to 3 weeks later; you can shower before it arrives with a temporary curtain.

Do you do shower remodels near me?

Yes, if your home is in Snohomish County, North Seattle or on the Eastside. We work out of an office on SE Everett Mall Way in Everett and rebuild showers in Everett, Mill Creek, Mukilteo, Lynnwood, Edmonds, Bothell, Kirkland and the other cities on our service area page. If your town is not listed there, ask and we'll tell you.

Is the work covered by a warranty?

Yes. Every bathroom has a written 2-year warranty from the final walkthrough. It covers our labor, the waterproofing and the tile we install. Caulk joints are covered for the first year only. Manufacturer defects in fixtures and materials fall under the manufacturer's warranty, and we help you file the claim. See what the warranty covers (opens in a new tab).

Rather talk it through?

Call us Mon–Sat, 9 am–8 pm, or request a free on-site consultation.

Free Shower Upgrade Package through Dec 31, 2026 (opens in a new tab)

Pick a day, and we come to you

Pick a day and a time window for a free on-site consultation. We'll call to confirm.

What's included

  • Measurements and a look at your bathroom, at your home
  • 3D design of your new layout
  • Material selections that work together
  • A written scope and quote
  • Financing options through Wisetack
  • 2-year workmanship warranty

Prefer to talk? Call (425) 550-9475

Step 1 of 30% complete
Pick a day and time

Choose a time window for your free consultation. This is a request, not a booked appointment. We'll call to confirm.

Select a time window above.

Pacific Time. Morning 9 to 12, afternoon 12 to 4, evening 4 to 8.

Walk-in showers in Everett and Snohomish County

A lot of the showers in older Snohomish County homes are original fiberglass stalls or tile set over a mortar bed with no membrane. When we open them up, we check three things first: whether the pan has been leaking, whether the subfloor has gone soft, and what is holding the wall tile besides old grout.

A walk-in shower is also a common first step toward aging in place: a low curb or none, a bench or fold-down seat, a hand shower on a slide bar and grab bars anchored into blocking. If that is the goal, see accessible bathroom remodeling.

A fan sized for the room and ducted outside helps the shower dry between uses. If the existing fan is undersized or vents into the attic, we include a replacement or duct repair in the scope.

When the valve or drain changes, the work usually needs a plumbing permit, and in several cities around here any tub or shower replacement needs one. Inside Everett city limits that is the City of Everett; in unincorporated Snohomish County it is Planning and Development Services. We apply and book the inspection; the permit is priced separately. Before we open walls, a certified inspector checks for asbestos, as the Puget Sound Clean Air Agency requires for contractor work in the region; that test is priced separately too.

ADD BATH is based on SE Everett Mall Way. We are a WA-registered contractor (L&I ADDBABL764KO), bonded and insured. We work across Snohomish County, from Everett, Mukilteo and Mill Creek to Lake Stevens and Marysville, and in North Seattle and on the Eastside (service area).

Focus on your project choices. Close this view to return to the page without losing your answers.

ADD BATHGet an estimateYour bathroom, your choices.

Choose your service and preferred consultation date. Close this view to return without losing your answers.

ADD BATHRequest a visitLet's make room for your project.