White bathroom with a freestanding tub, a glass walk-in shower with black fixtures, marble-look tile and a window

Snohomish County, North Seattle and the Eastside

Full bathroom remodels

Replace the tub or shower, tile, vanity, toilet, fan and lighting as one project. Keep the layout that works, or plan a complete remodel down to the studs. We measure the room and put the work in a written scope before demolition.

Get a free estimate

Free on-site consultation. We usually reply within an hour, Mon to Sat, 9 am to 8 pm.

or build your bathroom in 3DCall (425) 550-9475

5.0 on Google, 84 reviewsand 5.0 on Yelp, 18 reviews

OfferFree Shower Upgrade Package Through Dec 31, 2026 · Valid with financing. Offer details (opens in a new tab)

  • Google5.0(84 reviews)
  • Yelp5.0(18 reviews)
  • MaxMay 2024 on Google

    New bathroom with a larger shower

    You used excellent materials to build my new bathroom... And they did it in ten days... You were able to make my shower larger and being as I'm a big guy I love it. They didn't make a mess during demo.

  • Louis M.March 2025 on Google

    Modern bathroom remodel

    Exceeded all my hopes for a modern bathroom! The design and execution were handled with such professionalism and thoughtfulness that I never felt overwhelmed by the renovation process.

  • Dovie R.March 2025 on Google

    Bathroom remodel

    I am thrilled with my bathroom remodel! The team was incredibly professional, and the end result is simply stunning!

  • Terea B.July 2025 on Google

    Subfloor and joist repair under a bathroom

    We discovered a soft spot on our bathroom floor... After the initial tear out, the damage was much more severe than expected. Dmitrii gave a second quote and took care of the problem... He is very professional, and he explained all as he went along.

  • Kate S.May 2024 on Google

    Basement bathroom and rental conversion

    Turned my cold grey unusable basement into a great rental unit for a bargain of a price. He helped plan out the layout... and made sure that it was all up to code and fully legal.

  • Ok S.May 2024 on Google

    Tub and shower renovation

    Vlad and team did a wonderful job, my tub and shower came out beautiful. They went above and beyond to make sure the finished product blended with the rest of my bathroom and left no mess behind.

Plan your bathroom in 4 quick steps

Your bathroom plan0% complete
Step 1 of 4Project type
What would you like to change?

Choose one to continue.

What a full remodel covers

A full remodel replaces the surfaces and fixtures throughout the room while keeping the tub or shower, vanity and toilet in their existing positions.

We check the framing, subfloor and ventilation as the room is opened. Your written scope sets out the work before demolition.

Planning a different layout? For layout changes or rebuilding to the studs, see the complete remodel scope.

Protection and demolition
Floor and path protection, dust barriers, demolition, haul-away and daily cleanup.
Framing and subfloor
Framing and subfloor checks, with needed repairs before anything is closed.
Plumbing and waterproofing
Tub or shower fittings installed by licensed plumbers, plus shower waterproofing and a flood test before tile.
Tile and glass
Wall and floor tile, a niche, metal trim, and a glass door or panel.
Fixtures, lighting and ventilation
Vanity, sink, faucet, mirror, toilet, exhaust fan and lighting.
Finish work and walkthrough
Paint, trim and accessories, followed by a walkthrough and punch list.

Plan a full bathroom remodel

Tell us about your room, and we'll call to set up a free on-site consultation.

When to consider a full remodel

Soft or bouncy floor

Movement around the toilet or tub is a reason to check the subfloor before new tile is installed. Any damage changes what needs to be repaired.

Grout that keeps cracking

Cracks that return, loose tile or movement at the corners call for a closer look at the surface and the layers behind it.

Musty smell or peeling paint

An exhaust fan that is not working or is not vented outdoors should be addressed as part of the room, along with any moisture damage found during the work.

Stains on the ceiling below

A stain below the bathroom needs an inspection to identify its source. The repair scope depends on where water is entering and what it has affected.

A tub nobody uses

A full remodel is a chance to choose a tub or shower that fits how you use the room. If you want to keep a tub, see bathtub replacement.

Not enough storage or light

We check vanity size, lighting positions and niche placement against the existing layout before choosing fixtures and finishes.

Completed bathroom remodels

White bathroom with a freestanding tub, a glass walk-in shower with black fixtures, marble-look tile and a window
Freestanding tub and glass shower
Bathroom with a freestanding tub, a wood-look accent wall, a black rain shower and patterned floor tile
Freestanding tub and wood-look wall
White shaker-style double vanity with a quartz top and two undermount sinks
White shaker double vanity
Shower with a sliding glass door and brushed-gold hardware, marble-look walls and a tiled niche with shelves
Shower with brushed-gold hardware
Bathroom with a glass shower next to a window and a white vanity with a lit mirror
Shower and vanity side by side
Tiled walk-in shower with large-format gray wall and floor tile, glass enclosure and a linear drain
Large-format tile and glass shower
Small bathroom with a dark vanity, a toilet and a tub with gray tile surround
Small bath with tub and vanity
Bathroom with green shower tile, a wood-finish double vanity, two sinks and light floor tile
Green shower tile and double vanity
Tub with a white tile surround, a curved black shower rod, a handheld shower and a mosaic niche
Tub with a tile surround
Large walk-in shower with gray stone-look tile, a rain shower head, a handheld shower and a lighted niche
Shower with a lighted niche
Long bathroom with a double vanity, lit mirrors and a walk-in shower at the end
Long double vanity and walk-in shower
Walk-in shower with marble-look tile, a window, a corner bench and a handheld shower
Window and corner shower bench

See more of our projects

Preparation and waterproofing before tile

The finish you see depends on layers you never will. On every tiled shower we build:

Conceptual 3D shower cutaway showing tile, setting mortar, blue waterproofing, backing board and timber framing, with a P-trap below the floor and a connected ceiling fan duct
Conceptual cutaway. Layer thicknesses are exaggerated for clarity.
  1. Solid framing and blocking

    Straight, dry studs with blocking for the valve, niche, bench and future grab bars, even if you do not want bars today.

  2. Sloped base and correct drain

    A pre-sloped or mortar base pitched toward a center or linear drain, so water runs to the drain instead of standing on the floor.

  3. Continuous waterproof membrane

    A sheet or liquid membrane system bonded to walls and floor, with sealed seams, corners and pipe penetrations, installed to the manufacturer's instructions.

  4. 24-hour flood test

    Before any tile goes down, the shower floor is filled with water and checked the next day. We photograph it for your project file.

  5. Tile, grout and movement joints

    Tile set with full coverage, the right grout for wet areas and flexible joints where planes meet, because walls and floors move a little and grout in a corner tends to crack.

  6. Ventilation sized for the room

    An exhaust fan ducted outside helps remove moisture after showers. We check the duct route and include needed repairs in the scope.

Planning only the shower? See shower remodeling and custom walk-in showers. Replacing a tub with a shower? See tub-to-shower conversion.

What is included in a same-layout remodel

How it is quoted

Free written quotewith 3D design

What it covers. For a standard 5x8 bathroom: a new tub with a tile surround and sliding glass door, floor tile, a niche, vanity, toilet, mirror and light, a new fan on a humidity switch, paint and trim. Labor and rough materials at our Essential package level (the finish materials you pick are extra). Asbestos testing and permits are priced separately. Your written scope shows every line before you sign.

What moves it up. Higher-priced tile or fixtures, and repairs behind the walls.

Pay over time with Wisetack. 0% APR options for up to 12 months.* *Subject to credit approval. See terms

Timeline

How long it takes

A full bathroom remodel with the same layout usually takes 2 to 4 weeks on site, and a tub-to-shower conversion about 7 to 9 working days. Permits, inspections and material delivery can add time; you get your own schedule with the written scope. See typical timelines

Request an on-site consultation

Tell us about your room, and we'll call to set up a free on-site consultation.

Get a free estimate

Complete remodels: rebuilding to the studs

We use complete remodel for work that takes the room down to the studs. The scope can include changes to walls, the toilet or the drain, along with new plumbing, wiring, ventilation and waterproofing before tile. Your written scope lists the work included in the project:

  • Protection of floors and the path through your home, dust barriers and daily cleanup
  • The room taken down to the studs and hauled away
  • Framing, blocking and subfloor repair before anything is closed
  • New shower valve and drain, moved if the layout changes, by licensed plumbers
  • Exhaust fan ducted outdoors on a humidity switch, recessed lights, a vanity light and GFCI outlets
  • Backer board and a waterproof membrane, flood-tested before tile
  • Large-format wall tile, floor tile, a niche and metal trim
  • Vanity, top, sink, faucet, mirror, toilet and accessories
  • Glass door, paint, baseboards, door casing and a final walkthrough

Quoted to your exact room. A complete remodel takes the bathroom down to the studs so plumbing, ventilation, waterproofing and finishes are all renewed together.

What it covers. The tub replaced with a walk-in shower on an acrylic base, 24x48 porcelain wall tile, a corner shelf and a factory glass door, a vanity with top and faucet, a mirror and light, a new toilet, new floor tile, a fan on a humidity switch, paint and trim. Labor and rough materials at our Essential package level (the finish materials you pick are extra). Asbestos testing and permits are priced separately.

What moves it up. A window detail in the shower, recessed lights, moving the toilet or drain, a tiled shower pan or frameless glass.

Rebuilding to the studs may be appropriate when the work includes damaged framing or subfloor, a leaking shower pan, or changes to the room's layout. We review those conditions before deciding what the scope needs to include.

Taking the room to the studs is also the time for the things that are hard to add later: blocking for grab bars, a fan ducted outside, a dedicated circuit and plumbing moved to where the room works best.

When the valve or drain changes, the work usually needs a plumbing permit, and in several cities around here any tub or shower replacement needs one. Inside Everett city limits that is the City of Everett; in unincorporated Snohomish County it is Planning and Development Services. We apply and book the inspection; the permit is priced separately. Before we open walls, a certified inspector checks for asbestos, as the Puget Sound Clean Air Agency requires for contractor work in the region; that test is priced separately too.

Essential, Comfort and Premium packages

Every full bathroom includes demo and haul-away, framing touch-ups, new floor tile, a new fan on a humidity switch, GFCI outlets, baseboards, paint, towel bar and hooks, project management and final cleanup. The package sets what goes in the room and the grade of rough materials (waterproofing, fan, switches, paint), which goes up with each package.

Each package below shows a sample 5x8 walk-in shower configuration (you can choose a tub instead) and can be customized during your free on-site consultation.

Essential

Clean & durableFree written quote

  • Acrylic shower base
  • Standard valve and shower head
  • Corner shelf, no niche
  • Factory glass door or a curtain

Finish materials selected with you at consultation

Comfort

Most popularFree written quote

  • Acrylic shower base
  • Tiled niche
  • Factory glass door

Finish materials selected with you at consultation

Premium

Custom & spaFree written quote

  • Custom tiled shower floor
  • Frameless glass
  • Thermostatic valve, hand shower
  • Recessed lights

Finish materials selected with you at consultation

Design your bathroom in 3D.

Pick your room size, layout, style and fixtures in our 3D builder, then request a custom written quote.

Build your bathroom in 3D

Choose a starting design

Six bathroom design options with suggested tile, vanities and fixtures.

Modern minimal

Clear Line

Modern minimal. Large-format porcelain, a floating vanity, frameless glass and a curbless shower.

Classic for older homes

Bungalow Classic

Classic for older homes. Marble-look tile, a hex mosaic floor, a vanity on legs and polished nickel.

Questions about a full bathroom remodel

How much does a full bathroom remodel cost?

The price of a full bathroom remodel depends on your room dimensions, whether plumbing stays in place, tile versus grout-free wall panels, your vanity and fixture selections, and any repairs uncovered behind the walls. We measure your room during a free on-site consultation and provide a firm, line-by-line written quote with Washington sales tax shown separately. See what drives bathroom remodel cost and how pricing works.

How much does a complete bathroom remodel cost?

A complete down-to-the-studs remodel is quoted around your room size, new plumbing or electrical layout changes, custom tiled pan or curbless entry, glass style, lighting and finish selections. Permits and asbestos testing (when required) are listed clearly on separate lines in your written quote.

How long will my bathroom be out of service?

A full bathroom remodel with the same layout usually takes 2 to 4 weeks on site, and a tub-to-shower conversion about 7 to 9 working days. Permits, inspections and material delivery can add time; you get your own schedule with the written scope. See typical timelines Moving walls or hidden damage can add time. Glass is measured after tile and installed 1 to 3 weeks later; you can shower before it arrives with a temporary curtain.

Do you pull the permits?

Yes. When the work needs a permit (moving plumbing, new circuits, a new bathroom, structural changes, and in several cities any tub or shower replacement), we apply for it, schedule the inspections and keep the permit card on site. The permit fee is listed in your quote.

What happens if you find rot or damage behind the tile?

We stop, photograph it and show you before anything else happens. Your contract lists unit prices for the most common repairs (subfloor, studs, joist sistering), so you know the cost of the fix before we continue. Nothing is covered up without your approval.

Can I keep my current layout?

Yes, if the existing fixture positions work for the room. That is the starting point for our full remodel scope: the tub or shower, vanity and toilet remain in their current positions. We still check the plumbing, subfloor and ventilation before planning the finishes. For work in a smaller room, see small bathroom and powder room remodeling.

Is the work covered by a warranty?

Yes. Every bathroom has a written 2-year warranty from the final walkthrough. It covers our labor, the waterproofing and the tile we install. Caulk joints are covered for the first year only. Manufacturer defects in fixtures and materials fall under the manufacturer's warranty, and we help you file the claim. See what the warranty covers (opens in a new tab).

What is the difference between a full and a complete remodel?

ADD BATH uses full remodel for a project that keeps fixture positions and complete remodel for work that takes the room to the studs and may change the layout. The difference is the scope of work in your bathroom. Changes to plumbing or structure can also affect permits, inspections and scheduling.

Is a bathroom renovation the same as a remodel?

Homeowners use both terms. Our written scope defines the work, including whether fixtures stay in their existing positions or the room is rebuilt to the studs. Some homeowners call the latter a gut bathroom remodel.

Can you move the toilet or the shower drain?

Usually. Over a crawlspace it is simpler; over a slab we cut and patch the concrete. We look under the floor at the first visit and show you what each option involves before you decide.

Rather talk it through?

Call us Mon–Sat, 9 am–8 pm, or request a free on-site consultation.

Free Shower Upgrade Package through Dec 31, 2026 (opens in a new tab)

Pick a day, and we come to you

Pick a day and a time window for a free on-site consultation. We'll call to confirm.

What's included

  • Measurements and a look at your bathroom, at your home
  • 3D design of your new layout
  • Material selections that work together
  • A written scope and quote
  • Financing options through Wisetack
  • 2-year workmanship warranty

Prefer to talk? Call (425) 550-9475

Step 1 of 30% complete
Pick a day and time

Choose a time window for your free consultation. This is a request, not a booked appointment. We'll call to confirm.

Select a time window above.

Pacific Time. Morning 9 to 12, afternoon 12 to 4, evening 4 to 8.

Plan the scope around your existing room

Start with what you want to keep. If the tub or shower, vanity and toilet already sit where you want them, a same-layout remodel can replace the finishes and fixtures without moving those positions.

If the work needs to go behind the walls or below the floor, we review the framing, subfloor, plumbing and ventilation before planning the new finishes. A complete remodel can also include changes to the layout.

Permits depend on the work and the project's jurisdiction. When your project needs one, we apply, book the inspections and list the fee in your scope. Asbestos testing and permits are priced separately.

ADD BATH is based in Everett and serves Snohomish County, North Seattle and the Eastside. Check our service area to see whether we work at your address.

Focus on your project choices. Close this view to return to the page without losing your answers.

ADD BATHGet an estimateYour bathroom, your choices.

Choose your service and preferred consultation date. Close this view to return without losing your answers.

ADD BATHRequest a visitLet's make room for your project.