Bathroom remodel cost in Snohomish County and North Seattle

What actually drives the cost of a bathroom remodel here, what every written quote covers, and how to plan your layout in 3D before we visit.

Get a free estimate

Free on-site consultation. We usually reply within an hour, Mon to Sat, 9 am to 8 pm.

or build your bathroom in 3DCall (425) 550-9475

5.0 on Google, 84 reviewsand 5.0 on Yelp, 18 reviews

OfferFree Shower Upgrade Package Through Dec 31, 2026 · Valid with financing. Offer details (opens in a new tab)

  • Google5.0(84 reviews)
  • Yelp5.0(18 reviews)
  • Louis M.March 2025 on Google

    Modern bathroom remodel

    Exceeded all my hopes for a modern bathroom! The design and execution were handled with such professionalism and thoughtfulness that I never felt overwhelmed by the renovation process.

  • MaxMay 2024 on Google

    New bathroom with a larger shower

    You used excellent materials to build my new bathroom... And they did it in ten days... You were able to make my shower larger and being as I'm a big guy I love it. They didn't make a mess during demo.

  • Kate S.May 2024 on Google

    Basement bathroom and rental conversion

    Turned my cold grey unusable basement into a great rental unit for a bargain of a price. He helped plan out the layout... and made sure that it was all up to code and fully legal.

  • Dovie R.March 2025 on Google

    Bathroom remodel

    I am thrilled with my bathroom remodel! The team was incredibly professional, and the end result is simply stunning!

  • Terea B.July 2025 on Google

    Subfloor and joist repair under a bathroom

    We discovered a soft spot on our bathroom floor... After the initial tear out, the damage was much more severe than expected. Dmitrii gave a second quote and took care of the problem... He is very professional, and he explained all as he went along.

Bathroom remodel cost at a glance

In Snohomish County and North Seattle, bathroom remodel costs depend on the room size, whether plumbing stays in place, the wet-zone system you choose (porcelain tile vs. grout-free wall panels), finish materials and what we uncover behind older walls. Here is how each scope compares and what goes into a written quote.

  1. Written quoteFree on-siteexact room measurements, 3D design preview and line-by-line written scope
  2. Wet-zone upgrades7 to 9 daystypical on-site build time for a tub-to-shower conversion or shower rebuild
  3. Powder room3 to 8 daystypical on-site build time for a half bath refresh in the same layout
  4. Same layout2 to 4 weeksfor a full bathroom on site; a large primary bathroom takes 1 to 3 months
ProjectTypical timeline & quoteWhere to read more
Full remodel, standard 5x8 bathroom2 to 4 weeks · Free written quoteFull bathroom remodeling
Complete remodel, taken to the studs2 to 4 weeks · Free written quoteThe room to the studs
Primary bathroom, 8x101 to 3 months · Free written quotePrimary bathroom remodel
Accessible shower, low curb or curbless7 to 9 days · Free written quoteAccessible bathroom remodel
Shower remodel, tiled walk-in7 to 9 days · Free written quoteShower remodeling
Tub-to-shower conversion7 to 9 days · Free written quoteTub-to-shower conversion
Bathtub replacement7 to 9 days · Free written quoteBathtub replacement
Shower wall panels, grout-free systemFast build · Free written quoteShower wall panels
Powder room3 to 8 days · Free written quoteSmall bathroom and powder room remodel
Bathroom addition, half bath1 to 6 months · Site review quoteBathroom additions
Basement bathroom addition1 to 6 months · Site review quoteBasement bathroom addition
Small repairs and upgrades1 to 2 visits · Photo or visit quoteSmall projects
Shower leak repairQuoted after leak inspectionWater damage & shower leak repair

Every ADD BATH quote is customized to your bathroom after a free on-site consultation, with labor, rough materials, finish materials, permits (if needed) and Washington sales tax shown on clear separate lines. See how our pricing works.

Want a written quote?

Tell us about your room, and we'll call to set up a free on-site consultation.

Get a free estimateCall (425) 550-9475

Mon to Sat, 9 am to 8 pm. We usually reply within an hour.

How a bathroom price is built

Every ADD BATH written quote is built from the same four clear layers, so you always know what you are paying for.

  1. Labor and rough materials

    Demolition, protection, framing corrections, plumbing and electrical rough-in, backer board, flood-tested waterproofing, ventilation and paint. Skilled trade labor is typically 50 to 60% of a bathroom budget.

  2. Finish materials you pick

    Tile or wall panels, tubs, shower bases, valves and trim, glass, vanities, faucets, toilets, mirrors and lighting. We review samples with you during the consultation so every finish fits both your style and budget.

  3. Washington sales tax

    It applies to the full contract price, labor included. We estimate it at 9.9% (the Everett rate inside the Sound Transit district); your rate depends on the project address.

  4. Priced separately

    Asbestos testing (in older homes) and city permits are listed clearly on their own lines whenever required. If hidden damage turns up after demolition, the repair is priced from the unit prices in your written scope, and you approve it in writing before the work is done.

Your written quote shows each line, with materials and labor separated and Washington sales tax on its own line.

How packages and scope compare near Seattle

Online "average bathroom cost" articles blend completely different scopes — a cosmetic refresh, a wet-zone conversion, and a full gut remodel with relocated plumbing. Instead of guessing from generic averages, we organize remodels into three clear build levels tailored to your room:

RoomEssentialComfortPremium
5x8 full bathroom with walk-in showerAcrylic base, corner shelf, framed glassAcrylic base, tiled niche, factory glassCustom tiled pan, frameless glass, thermostatic valve, recessed lights
8x10 primary bathroomAcrylic base, double vanity, standard valve & framed glassCustom tiled floor, niche & bench, frameless glass, heated floorCurbless tiled shower, rain head & hand shower, LED mirrors, heated floor

Every package includes floor protection, demo and haul-away, framing checks, flood-tested waterproofing on tiled pans, licensed plumbing and electrical work, and a 2-year written warranty. Compare full details on full bathroom remodeling and primary bathroom remodel.

What drives shower remodel and replacement cost

Rebuilding a shower means taking the old unit down to the studs, checking the subfloor and framing, installing a new valve and drain, waterproofing the wet zone, and finishing with porcelain tile or grout-free wall panels. What moves the budget most is the shower floor (acrylic base vs. custom tiled pan vs. recessed curbless entry), custom features like benches and niches, and framed vs. custom frameless glass.

  • An accessible shower adds solid wood blocking, anchored grab bars, a handheld sprayer on a slide bar, a folding or built-in seat, and either a low-curb or curbless entry.
  • Shower wall panels (acrylic or composite) install faster than custom tile and remove grout maintenance; we bring samples to your free consultation.
  • Custom glass is measured after the walls are finished and installed 1 to 3 weeks later; you can shower with a temporary curtain until it arrives. See shower door installation.

See shower remodeling for the full list of work.

Tub-to-shower conversion scope

A tub-to-shower conversion replaces your old alcove tub with a walk-in shower in the same footprint: removing the tub, converting the drain to a 2-inch shower drain, replacing the valve, waterproofing the walls and base, installing porcelain tile or wall panels, and fitting a glass door. On site it takes about 7 to 9 working days when there is no serious water damage and no plumbing to relocate.

Keeping a tub instead? Replacing the tub together with a new surround (acrylic wall panels or porcelain tile), new valve and waterproofing is quoted as one clean scope — including heavy cast-iron tub removal if your older home has one. See tub-to-shower conversion, bathtub replacement and our bathtub replacement guide.

Small bathrooms: 5x8, 5x10 and powder rooms

Keeping the tub or shower, toilet and vanity in their existing plumbing positions is the best way to control cost in a 5x8 hall bath or powder room. A powder room refresh typically takes 3 to 8 working days on site, while a full 5x8 bathroom in the same layout takes about 2 to 4 weeks.

Every room size — whether 4x6, 5x8 or 5x10 — is measured at your free consultation and quoted line by line based on your exact tile area and fixture choices. See small bathroom and powder room remodeling and the 5x8 bathroom layouts guide.

How small bathroom projects are quoted

Small projects are quoted by the job in writing before work starts — often quickly from photos plus a quick check on site. If you decide not to go ahead after we look at the job, there is no charge for the visit. Small projects carry a 1-year workmanship warranty; full remodels carry a 2-year warranty.

Small projectHow it is quoted
Replace a bathroom faucetFast photo or visit quote
Replace a toiletFast photo or visit quote
Replace a single vanity with a top, sink and faucetFast photo or visit quote
Replace a fan on the existing ductFast photo or visit quote
Regrout and seal a shower floorQuoted after tile inspection
Heated tile floor in a bathroomQuoted after measurement

You choose your fixtures, vanity and finish materials, and we provide rough supplies and installation. Custom glass or made-to-measure quartz countertops are templated and ordered to fit your room.

Explore small projects, vanity installation, exhaust fan and lighting installation, fixture replacement and tile installation.

What moves a bathroom price up or down

Popular upgrades that affect budget

These upgrades are priced individually in your written scope (and several are bundled into our Comfort and Premium packages):

  • Built-in tiled shower bench, waterproofed with the shower.
  • Recessed tiled niche framed between studs.
  • Ceiling rain shower head with a diverter valve.
  • Handheld shower on a slide bar.
  • Thermostatic shower valve for steady temperature control.
  • Fold-down shower seat anchored into solid blocking.
  • Recessed LED ceiling lights on a dimmer switch.

Moving plumbing is the biggest single driver: relocating a toilet, a drain or a shower valve opens floors and walls and usually needs a permit. Hidden damage, such as a rotted subfloor, is priced from unit prices in your written scope. A curbless entry costs more than a low curb because the floor may be recessed and the drain is linear. Frameless glass and full enclosures cost more than a framed door.

What keeps it down

  • Keep the toilet, the drain and the valve where they are.
  • Choose a low curb over a curbless entry.
  • Choose a framed glass door over frameless glass.
  • Keep the tile layout simple: mosaics, patterns, extra niches and benches take more labor.
  • Do the work as one scope. A tub replacement, a new vanity and a new floor in one project mean you pay for demo, protection and cleanup once.
  • For small projects, put several fixes in one visit; it costs less than separate trips.

Design your own bathroom in 3D

Our interactive 3D bathroom builder lets you visualize your room before we visit. Pick the room size (a 4x6 powder room, a 5x8 full bathroom or an 8x10 primary bathroom), choose a package and one of our six design palettes, and toggle your shower or tub, tile or wall panels, glass, vanity, toilet, heated floors and lighting.

When you request your free on-site consultation, your 3D selections are sent right to our team so we can prepare an accurate, line-by-line written quote.

How long it takes, and paying over time

On site, a tub-to-shower conversion or a tub replacement takes about 7 to 9 working days, a powder room 3 to 8, a full bathroom in the same layout 2 to 4 weeks and a large primary bathroom 1 to 3 months. Permits, inspections and material delivery can add time; you get your own schedule with the written scope. See typical timelines.

Pay over time with Wisetack. 0% APR options for up to 12 months.* *Subject to credit approval. See terms

Questions about price and scope

How much does a bathroom remodel cost in Snohomish County?

The total depends on your room size, whether plumbing lines stay in place, tile versus grout-free wall panels, your fixture and vanity selections, and any hidden repairs behind older walls. We measure your room at a free on-site consultation and provide a firm, line-by-line written quote before any work begins.

Why do bathroom remodel quotes near Seattle vary so widely?

Quotes vary because contractors often price completely different scopes — some leave out waterproofing flood tests, glass, permits, haul-away or Washington sales tax. Comparing scopes line by line is the only reliable way to compare bids fairly.

What affects the cost of a shower remodel or walk-in shower?

The main drivers are acrylic base versus custom tiled shower pan, low-curb versus recessed curbless entry, tile size and pattern, custom additions like benches and niches, framed versus custom frameless glass, and any subfloor or framing repairs uncovered during demo.

What affects the cost of a tub-to-shower conversion?

Keeping the drain and valve in the existing tub alcove keeps the project efficient. Your choice of porcelain tile versus grout-free wall panels, glass style, cast-iron tub removal and accessories (niche, bench, grab bars) set the final written quote.

How can I keep a small bathroom remodel cost under control?

Keep the tub or shower, toilet and vanity in their existing plumbing positions, choose a low-curb shower over a recessed curbless floor, keep tile layouts clean and complete all desired updates in one coordinated scope.

What is listed separately in a written quote?

Every ADD BATH quote clearly separates labor, rough materials, finish allowances or customer-supplied items, Washington sales tax (which applies to the full contract in WA), and permits or asbestos testing when required. Hidden damage is photographed and approved in writing before any repair.

Free Shower Upgrade Package through Dec 31, 2026 (opens in a new tab)

Pick a day for your free on-site consultation

Choose a time window and we'll call to confirm.

What's included

  • Measurements and a look at your bathroom, at your home
  • 3D design of your new layout
  • Material selections that work together
  • A written scope and quote
  • Financing options through Wisetack
  • 2-year workmanship warranty

Prefer to talk? Call (425) 550-9475

Step 1 of 30% complete
Pick a day and time

Choose a time window for your free consultation. This is a request, not a booked appointment. We'll call to confirm.

Select a time window above.

Pacific Time. Morning 9 to 12, afternoon 12 to 4, evening 4 to 8.

Local prices in Everett and Snohomish County

Prices here follow local conditions. Many homes around Everett, Lynnwood and Mill Creek are 30 to 60 years old, permits come from the City of Everett or from Snohomish County Planning and Development Services, and licensed trades cost more than the national average.

ADD BATH is based on SE Everett Mall Way. We are a WA-registered contractor (L&I ADDBABL764KO), bonded and insured. We work across Snohomish County, from Everett, Mukilteo and Mill Creek to Lake Stevens and Marysville, and in North Seattle and on the Eastside (service area).

Focus on your project choices. Close this view to return to the page without losing your answers.

ADD BATHGet an estimateYour bathroom, your choices.

Choose your service and preferred consultation date. Close this view to return without losing your answers.

ADD BATHRequest a visitLet's make room for your project.