Tub with a white tile surround, a curved black shower rod, a handheld shower and a mosaic niche

Snohomish County, North Seattle and the Eastside

Bathtub replacement cost in Everett, WA (2026)

5.0 on Google, 84 reviewsand 5.0 on Yelp, 18 reviews

OfferFree Shower Upgrade Package Through Dec 31, 2026 · Valid with financing. Offer details (opens in a new tab)

In Everett and nearby Snohomish County cities, replacing an alcove bathtub properly means renewing the tub, wall surround (acrylic wall panels or porcelain tile), shower valve, waterproofing and drain together in one scope. Your written quote depends on the surround material, finish fixtures, whether an old cast-iron tub must be broken up in place, and any subfloor damage uncovered during demolition.

Bathtub replacement prices for 2026

These prices cover the tub and surround only: the vanity, toilet, floor and layout stay as they are. Each price is labor and rough materials for the same list of work at three package levels (Essential, Comfort and Premium). The finish materials you pick are extra; we review physical samples together during your free on-site consultation.

Bathtub replacement options & what affects the quote
OptionBuild scopeKey cost drivers
New tub with a tiled surroundEssential, Comfort or Premium buildTile format/pattern, niche, glass door & tub model
New tub with acrylic wall panelsGrout-free panels over cement boardPanel finish, shelving, glass door & tub model
Cast-iron tub break-up & removalSectioned in place & hauled awayExtra demolition labor & heavy debris disposal

Use these numbers to set a budget. Your written price comes after we see the bathroom. Our other packages are on the bathroom prices page.

Request an on-site consultation

Tell us about your room, and we'll call to set up a free on-site consultation.

Get a free estimateCall (425) 550-9475

Mon to Sat, 9 am to 8 pm. We usually reply within an hour.

What a complete tub replacement includes

Here is every line in both packages:

  • Demo and haul-away. The old tub and surround come out. The rest of the room stays.
  • New valve. Replaced while the wall is open, so new walls do not go up around an old valve.
  • Backer board and waterproofing. On all three walls of the alcove, behind the tile or panels.
  • New alcove tub. Installed with a new drain and overflow.
  • Wall finish. Either 24x48 tile on the three walls above the tub, or acrylic wall panels on the same three walls.
  • Drywall patch and finish. Where the new surround meets the existing walls.
  • Glass door. A sliding glass tub door.
  • Trim and cleanup. Plumbing trim, silicone and caulk, project management and a final cleanup.

Asbestos testing and permits are not in these prices; we price them separately when your bathroom needs them.

Why asbestos testing comes before demo

Older bathrooms can hide asbestos in the materials a tub job disturbs. The EPA lists patching compounds, textured paint, and vinyl flooring and its adhesives among household products that may contain it. Washington law (RCW 49.26.013) requires the owner or the owner's agent to have a good faith asbestos inspection done by an accredited inspector before a remodel or repair that could disturb it. The alternative is to assume asbestos is there and take the maximum precautions the rules require.

The Puget Sound Clean Air Agency, which covers Snohomish County, also requires a survey before renovation. Its renovation guidance lets an owner who lives in a single-family house being remodeled survey it themselves. Otherwise it takes an AHERA-certified building inspector. The inspector's survey is priced separately and done before the first wall comes down.

How to compare two tub quotes

When two tub quotes are far apart, first check whether they cover the same work. Compare quotes line by line and watch for these:

  • The old valve stays. Once the new wall is finished, a worn valve means cutting into it later.
  • No waterproofing line. Tile and grout shed water, but they are not the waterproof layer. The membrane behind them does that job.
  • No permit or asbestos survey. If a quote leaves them out, ask who arranges them and what they cost.
  • Door, drywall patch or haul-away "by owner." Each one is a cost you cover separately.

Tile or acrylic wall panels

Both options use the same tub, valve, waterproofing and door. The difference is the wall finish.

A tiled surround gives you the widest choice of color, texture and pattern. Our price assumes large 24x48 tile, which means fewer grout lines to clean. Acrylic wall panels have few seams and wipe clean. For labor and rough materials, panels cost less than tile at every package level, but panel finish materials usually cost more than tile, so the totals come out close. Choose on looks and upkeep more than price.

What moves the price

A cast-iron tub

An original cast-iron tub is heavy and awkward to carry through a hallway or down stairs in one piece, so we break it up in place and haul out the pieces. That extra demolition and haul-away labor is listed clearly as its own line item when your home has a cast-iron tub.

Rot or soft subfloor under the tub

Nobody can see under a tub until it is out. If a slow leak has softened the subfloor, that section gets repaired before the new tub goes in, rather than covered over. A good written scope says up front how hidden damage like this is handled and priced. Our water damage repair page explains how that work goes.

Moving the drain

Our prices assume the new tub goes where the old one was, with the drain at the same end. Switching the drain side or moving the tub means opening the floor and rerouting pipes, which is priced separately.

The type of tub

Both packages use a standard alcove tub, the kind that sits between three walls. A deeper soaking tub, a freestanding tub, a jetted tub that adds electrical work, or a walk-in tub is a different scope with a different price.

Sales tax: Washington taxes the whole job

In Washington, a contractor working on your home collects retail sales tax on the full contract price (WAC 458-20-170). The Department of Revenue says the taxable amount includes labor, materials, permits and other fees, profit and subcontractor charges. The rate is set by the address where the work is done, and the tax should appear as its own line on the contract or invoice.

For October to December 2026, the DOR rate table lists Everett at 9.9% for addresses inside the Sound Transit district and 8.5% for Everett addresses outside it. Nearby Mill Creek and Mukilteo are at 10.6%. Rates can change each quarter, so check the current table before you sign. A quote without a tax line is not lower. It just has not added the tax yet.

When a shower makes more sense than a new tub

If nobody in the house takes baths, or stepping over a tub wall is getting harder, converting the alcove to a shower may be a better use of the same budget. Our tub-to-shower conversion page shows what that job includes. For the replacement itself, see our bathtub replacement page. Before you remove the last tub in the house, read our guide to tub-to-shower conversions and resale.

If the vanity, floor and fan are also near the end of their life, compare a tub replacement with a full bathroom remodel. Doing it all at once avoids paying for demo, protection and cleanup twice. Our bathroom remodel cost guide shows what larger projects run in Snohomish County and North Seattle.

How we price a tub replacement

We start with one visit, then give you a 3D layout and a written scope with a price range before any work begins. Permit fees and inspections are part of that written quote when your city requires them. Our remodeling team carries out the construction work, with licensed tradespeople handling the plumbing and electrical work. ADD BATH is registered with Washington L&I as contractor ADDBABL764KO, bonded and insured, and every tub replacement carries our written 2-year warranty (opens in a new tab) from the final walkthrough on labor, waterproofing and the tile we install. Caulk joints are covered for the first year only.

Common questions

How long does a bathtub replacement take?

A tub replacement takes about 7 to 9 working days on site when there is no serious water damage and no plumbing to move or repair; permits, inspections, material delivery and hidden damage found after demolition can add time. See typical timelines

Can I keep my tile and swap only the tub?

Rarely, in an alcove. The edge of the tub sits behind the bottom of the wall finish, so the lower walls have to come off to get the old tub out and the new one in. That is why both prices include new walls, waterproofing and finish.

Is sales tax included in these prices?

Washington sales tax applies to the full remodeling contract, labor included — so every ADD BATH written quote displays sales tax on its own separate line. For October to December 2026, the Department of Revenue rate for Everett addresses inside the Sound Transit district is 9.9%.

Can I pay over time?

Yes. We offer financing through Wisetack, and the financing page has the details.

Sources

Planning guides

Free Shower Upgrade Package through Dec 31, 2026 (opens in a new tab)

Free consultation

Schedule a visit

Pick a day and a time window for a free on-site consultation. We'll call to confirm.

What's included

  • Measurements and a look at your bathroom, at your home
  • 3D design of your new layout
  • Material selections that work together
  • A written scope and quote
  • Financing options through Wisetack
  • 2-year workmanship warranty

Prefer to talk? Call (425) 550-9475

Step 1 of 30% complete
Pick a day and time

Choose a time window for your free consultation. This is a request, not a booked appointment. We'll call to confirm.

Select a time window above.

Pacific Time. Morning 9 to 12, afternoon 12 to 4, evening 4 to 8.

Next steps

More on planning a bathroom

Focus on your project choices. Close this view to return to the page without losing your answers.

ADD BATHGet an estimateYour bathroom, your choices.

Choose your service and preferred consultation date. Close this view to return without losing your answers.

ADD BATHRequest a visitLet's make room for your project.