Snohomish County, North Seattle and the Eastside

Curbless walk-in shower in a 1970s hall bath

5.0 on Google, 84 reviewsand 5.0 on Yelp, 18 reviews

OfferFree Shower Upgrade Package Through Dec 31, 2026 · Valid with financing. Offer details (opens in a new tab)

A tub nobody used, over a subfloor that was already wet

A leak-prone tub alcove in a Silver Lake split-level, rebuilt as a zero-threshold shower with a linear drain, floor-to-ceiling porcelain, and a heated tile floor.

The call came from a Silver Lake split-level built in 1974: one hall bath, one tub, and two homeowners who had not taken a bath in it once in eleven years. They showered standing in it, stepping over a 16-inch wall every morning, and planned to stay in the house another fifteen.

What decided the project was not the dated tile. It was the soft spot: press the surround next to the valve and it moved. Water had been finding the wall behind the tile for years, and the subfloor at the base of the tub was stained dark.

The scope called for a step-free shower entry and repairs to the water-damaged materials behind the tile.

Free estimate

Prefer a call back?

Leave your name and number. We'll call to talk through a project like this one and set up a free on-site consultation.

Prefer to talk? Call (425) 550-9475

The work

What we changed

Demo to the studs revealed rot in two joist bays, which we repaired under the contract contingency. We recessed the pan between the joists for a true curbless entry, ran a linear drain along the back wall, and waterproofed pan and walls with a full membrane system, photographed for the project file. Then large-format porcelain went on floor-to-ceiling with a slip-rated mosaic floor, a built-in niche, and a fold-down teak bench. New fan, new valve, and a frameless glass panel finished it.

  • 24x48 large-format porcelain, floor-to-ceiling
  • 2-inch hex mosaic shower floor, slip-rated
  • Linear drain with tile-in top
  • Full waterproofing membrane system, pan + walls
  • Electric heated-floor mat, programmable thermostat
  • Frameless 3/8-inch glass panel, brushed brass hardware
  • Fold-down teak bench + blocking for future grab bars
Free Shower Upgrade Package through Dec 31, 2026 (opens in a new tab)

Free consultation

Schedule a visit

Pick a day and a time window for a free on-site consultation. We'll call to confirm.

What's included

  • Measurements and a look at your bathroom, at your home
  • 3D design of your new layout
  • Material selections that work together
  • A written scope and quote
  • Financing options through Wisetack
  • 2-year workmanship warranty

Prefer to talk? Call (425) 550-9475

Step 1 of 30% complete
Pick a day and time

Choose a time window for your free consultation. This is a request, not a booked appointment. We'll call to confirm.

Select a time window above.

Pacific Time. Morning 9 to 12, afternoon 12 to 4, evening 4 to 8.

The finished room

Result

The completed shower has a step-free entry and heated tile flooring. Inspection passed on the first visit, and six punch-list items were completed in one morning.

What would you change
in your bathroom?

Focus on your project choices. Close this view to return to the page without losing your answers.

ADD BATHGet an estimateYour bathroom, your choices.

Choose your service and preferred consultation date. Close this view to return without losing your answers.

ADD BATHRequest a visitLet's make room for your project.