Snohomish County, North Seattle and the Eastside
Complete hall-bath rebuild in a Mill Creek colonial
OfferFree Shower Upgrade Package
- WA registered contractor
- Bonded & insured
- L&I ADDBABL764KO
- 2-year workmanship warranty (opens in a new tab)
The vinyl was lifting at the toilet flange
The bath three kids and every visitor shared, taken back to the studs and rebuilt with a proper fan, a bigger vanity, and a wood-look porcelain floor.
The hall bathroom served two adults and three children. After nine years in the home, the family planned a remodel that included the lifting vinyl around the toilet.
We opened the floor on day one and found what the lifting vinyl had been saying: a slow flange leak had reached the subfloor and the base of the wall behind the toilet.
The repair required one sheet of plywood. The contract contingency covered it, and the scheduled finish date did not change.
Free estimate
Prefer a call back?
Leave your name and number. We'll call to talk through a project like this one and set up a free on-site consultation.
The work
What we changed
Full tear-out to the studs. The subfloor was patched and re-leveled, the flange reset, and the vent line brought up to current code. We shifted the vanity wall eight inches to fit a 42-inch double-drawer vanity, ducted a new 110 CFM fan to the roof, and tiled the tub surround floor-to-ceiling with a recessed niche. Wood-look porcelain plank went down over a decoupling membrane, with a new alcove tub and a pressure-balanced valve.
- Full tear-out to studs, subfloor repaired and re-leveled
- Wood-look porcelain plank over a decoupling membrane
- Floor-to-ceiling tub surround tile with recessed niche
- 42-inch double-drawer vanity, quartz top
- 110 CFM fan ducted to the roof
- New alcove tub, pressure-balanced valve
- Semi-frameless glass tub screen
Free consultation
Schedule a visit
Pick a day and a time window for a free on-site consultation. We'll call to confirm.
What's included
- Measurements and a look at your bathroom, at your home
- 3D design of your new layout
- Material selections that work together
- A written scope and quote
- Financing options through Wisetack
- 2-year workmanship warranty
Prefer to talk? Call (425) 550-9475
The finished room
Result
The completed hall bathroom has a new tub surround, vanity, floor and ventilation. Inspection passed on the first visit, and three punch-list items were completed that morning.