A condo bathroom remodel in Seattle usually needs your association's written approval under its declaration and rules, plus the permits your scope requires: the Seattle Department of Construction and Inspections (SDCI) issues building and electrical permits, and Public Health Seattle & King County issues plumbing permits. Most of the construction is the same as any bathroom remodel. What changes is the paperwork, the shared pipes and the building logistics.
Which Washington condo law covers your building
It depends on when the condo was created.
- On or after July 1, 2018: the Washington Uniform Common Interest Ownership Act, chapter 64.90 RCW (RCW 64.90.360), which also covers older communities that amended their declaration to opt in.
- After July 1, 1990 and before July 1, 2018: generally the Condominium Act, chapter 64.34 RCW, plus a few sections of the newer act.
- Before July 1, 1990: the Horizontal Property Regimes Act, chapter 64.32 RCW, plus selected sections of the later acts.
The older chapters are repealed effective January 1, 2028. From then on, chapter 64.90 RCW covers common interest communities, with a few exceptions.
For condos created after July 1, 1990, the two newer laws agree on the basics: an owner may alter the inside of a unit if the work does not affect the structural integrity or the mechanical or electrical systems (RCW 64.34.240, RCW 64.90.255), and changing the look of the common elements needs the association's approval. Both defer to your declaration. In a building created before July 1, 1990, the declaration and bylaws set these rules. Either way, ask the manager for the governing documents, any remodel policy and the alteration form.
Request an on-site consultation
Tell us about your room, and we'll call to set up a free on-site consultation.
What you own behind the tile
Under the default rules of the Condominium Act (RCW 64.34.204) and the newer act (RCW 64.90.210), when walls, floors and ceilings form the unit boundary, the finished surfaces belong to the unit: lath, furring, drywall or plaster, paneling, tile, wallpaper, paint and finished flooring. The rest of that wall, floor or ceiling is a common element. Where a pipe, duct or wire runs partly inside and partly outside your unit, the part serving only your unit is a limited common element assigned to you, and any part serving more than one unit is a common element. Fixtures fully inside your unit are part of the unit.
Your declaration can draw these lines differently. In a condo created before July 1, 1990, the older act sets the boundary at the interior surfaces of the perimeter walls, floors and ceilings (RCW 64.32.010), so check your declaration and plans.
In practice, finishes and fixtures are usually yours to replace, while risers and drain stacks serving other units are shared. Moving a drain can mean cutting into the floor structure, and a new fan duct may need a path through a shared wall or the exterior, so expect close review of both.
What the board will likely ask for
Alteration request forms tend to ask for:
- A description of the work and a layout drawing.
- The contractor's Washington L&I registration. Contractors must keep liability insurance, or an assigned account in its place, to stay registered (RCW 18.27.050). L&I's Verify tool lets you confirm a contractor is registered with a valid bond and insurance.
- A certificate of insurance, sometimes naming the building as an additional insured.
- Permit copies, a schedule, work hours, flooring specs and the water shut-off plan.
Get approval in writing before work starts, and call your insurance agent: some master policies do not cover upgrades an owner makes, and the state Insurance Commissioner explains how master and unit policies split coverage.
Hard floors and sound underlayment
Footsteps carry to the unit below, so many buildings require a sound-rated underlayment under tile or a minimum rating for the floor assembly. Get the requirement and accepted products in writing before you order tile. Underlayment adds height at the threshold and toilet flange, so plan for it early.
Water shut-offs, work hours, elevator and parking
- Water. In many condos, a bathroom's water cannot be shut off inside the unit, so the building turns off a riser that also feeds neighbors. Group plumbing work to keep shut-offs few.
- Work hours. Seattle's noise code allows construction from 7:00 a.m. to 7:00 p.m. on weekdays and 9:00 a.m. to 7:00 p.m. on weekends and legal holidays in multifamily and neighborhood commercial zones, where many condos sit. Impact tools such as jackhammers are limited to 8:00 a.m. to 5:00 p.m. on weekdays and 9:00 a.m. to 5:00 p.m. on weekends and legal holidays, which can matter when an old mortar-bed floor comes out. Building rules can be stricter.
- Elevator and parking. Many buildings want the elevator reserved and padded. Ask where a work van can load and whether debris can use building containers.
Seattle permits for a condo bathroom
- Building permits: SDCI. The city says you don't need a permit for minor repairs or alterations that cost $6,000 or less in any 6-month period, but work on load-bearing supports or the building envelope, or anything that reduces egress, light, ventilation or fire resistance, needs one no matter how small. A full remodel costs well past that, so confirm the permit path for your scope.
- Electrical permits: SDCI. An electrical permit is required when wiring is installed, altered, extended or connected to equipment.
- Plumbing permits: Public Health. Public Health Seattle & King County issues plumbing and gas piping permits in Seattle, needed whenever you install, relocate or change a plumbing system.
When required, permit fees and inspections are part of our written quote. See our guide to bathroom remodel permits in Washington and our Seattle bathroom remodeling page.
What a 5x8 condo bathroom costs
A 5x8 full bathroom with a tub is a common condo layout. We quote condo remodels line by line after reviewing your building's HOA rules, elevator access, water shut-off windows and exact room measurements.
| Scope | Build levels | Condo-specific factors |
|---|---|---|
| New tub with tile | Essential, Comfort or Premium | HOA work hours, elevator protection & shut-off windows |
| Tub to tiled shower | Essential, Comfort or Premium | Drain conversion, waterproofing flood test & HOA approval |
Condo conditions can move the final number: tight work hours, elevator bookings, a required underlayment or a drain move that touches the slab. See our 5x8 bathroom remodel guide, small bathroom remodeling and prices page.
A practical order of steps
- Have the bathroom measured and scoped. Our process is one visit, a 3D layout and a written scope with a price range before work begins.
- Get written approval and the permits your scope requires. Ask the manager which comes first.
- Book the elevator, loading and water shut-offs, and notify neighbors as your building asks.
- Build. A full bathroom remodel with the same layout usually takes 2 to 4 weeks on site, and a tub-to-shower conversion about 7 to 9 working days; permits, inspections and material delivery can add time. See typical timelines
- Finish with final inspections and the final walkthrough, where our written 2-year warranty (opens in a new tab) on labor, waterproofing and the tile we install begins. Caulk joints are covered for the first year only.
Common questions
Do I need HOA approval to remodel a condo bathroom?
Check your declaration and rules. For condos created after July 1, 1990, state law lets owners make interior alterations that do not affect the structure or building systems, but it defers to the declaration, which often requires a written request first. In an older condo, the declaration and bylaws decide.
Who is responsible for the pipes behind my bathroom wall?
Under the default rules of the Condominium Act (RCW 64.34.328) and the newer act (RCW 64.90.440), the association maintains common elements, including limited common elements, and each owner maintains their own unit. Your declaration can change that split, so ask before demolition opens the wall.
Can I move the toilet or shower in a condo?
Sometimes. A drain move often means opening the floor structure or slab, a common element, so it usually needs board approval, a plumbing permit and, if the work touches load-bearing structure, a building permit. Some buildings do not allow it.
Will my building ask for the contractor's insurance?
Many do. ADD BATH is registered with Washington L&I as ADDBABL764KO, bonded and insured. Whoever you hire, ask for the certificate early. See our guide to choosing a bathroom contractor in Washington.
Sources
- RCW 64.90.360: Common interest communities, applicability (Washington Uniform Common Interest Ownership Act)
- RCW 64.90.365: Common interest communities created before July 1, 2018
- RCW 64.34.010: Condominium Act applicability
- Chapter 64.32 RCW: Horizontal Property Regimes Act (condominiums)
- RCW 64.32.010: Definitions (apartment boundaries)
- RCW 64.34.240: Alterations of units
- RCW 64.90.255: Alterations of units
- RCW 64.34.204: Unit boundaries
- RCW 64.90.210: Unit boundaries
- RCW 64.34.328: Upkeep of the condominium
- RCW 64.90.440: Maintenance, repair, replacement
- RCW 18.27.050: Contractor insurance or assigned account
- WA L&I: Verify a contractor, tradesperson or business
- Seattle SDCI: Do you need a permit?
- Seattle SDCI: Electrical permit
- Public Health Seattle & King County: Plumbing and gas piping applications and permits
- Seattle SDCI: Noise code
- WA Office of the Insurance Commissioner: Learn how condo insurance works

